BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2025 at 8:00 PM

Updated May 24, 2025

Site work and paving for a mixed-use development in Marshall, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The City of Marshall (Owner) is requesting Bids for the construction of the following Project: Second Street Water Main Replacement The Project includes the following Work: The Project Base Bid includes the replacement of approximately 3,300 LF of water main on Second Street from Vine Street to Archer Avenue and from the intersection of Second Street and Poplar Street, one block to the east on Poplar Street. Alternate Bid 1 includes the installation of approximately 1,320 LF of water main on Plum Street from Fourth Street to First Street. Alternate Bid 2 the installation of approximately 285 LF of water main for the Maple StreetApartment Complex. This work will generally consist of the furnishing and installation of water system piping, fittings, valves, hydrants, services, connections, disconnections, and appurtenances for potable wa ter. Installation will consist of 8" PVC SDR-21 Water Main along design route. This work also in cludes surface restoration with various pavements, curbing, and sidewalk. The work shall include all labor, supervision, materials, supplies, transporta-tion, equipment, and services necessary and required to per-form the project as set forth in the Contract Documents. Provided the Contractor fur-un-nishes proof of proper insurance and bonding in a timely manner, it is anticipated that a Notice of Award of contract will be issued within 30-to-60 days of the date bids are opened and that a No-tice to Proceed will be issued within 10 days of the date of the Notice of Award. Each proposal shall contain the name of every person or firm interested in the same and shall be accompanied by bid bond, certified check, bank draft, or cashier's check payable to the order of City of Marshall, in an amount not less than 5% of the proposal. This Project shall reach Substantial Completion by May 1, 2026, and Final Completion by June 1, 2026.

Award

Water / Sewer

$694,388.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
68
Bidding Soon
884
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

May 8, 2025

Project location map

N 2nd St, Marshall, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.