BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 8, 2025 at 8:00 PM

Updated April 12, 2025

Site work for a water / sewer project in Phoenix, Arizona. Completed plans call for site work for a water / sewer project.

The City of Phoenix is seeking a qualified contractor to provide preconstruction services and complete construction services for the Water Mains Replacement Orangewood Avenue to Northern Avenue and 12th Street to 16th Street Construction Manager at Risk (CMAR) project. The selected CMAR will work as a team with the designer of record and City staff to ensure an efficient design approach for the project. PROCUREPHX PRODUCT CATEGORY CODE 912000000 RFx 6000001765 Questions pertaining to this selection process or contract issues should be directed to the Contract Specialist, Julie B. Smith at (602) 534-2418 or julie.b.smith@phoenix.gov (preferred). The CMAR will begin with the firm in an agency support role for preconstruction services. CMAR will replace or rehabilitate approximately 23,005 linear feet of water mains in the area bounded by Orangewood Ave to Northern Ave and 12 th St to 16 th St (QS24-30) with approximately 60 LF of 4" Main, 11,979 LF of 6" Main, 5,238 LF of 8" Main, & 5,728 LF of 12" Main. The scope will also include approximately 22 FH's, 36 Cut & Plugs & 218 Service Lines. The CMAR will assume the risk of delivering the project through a Guaranteed Maximum Price (GMP) contract. The CMAR will be responsible for construction means and methods and will be required to solicit bids from prequalified subcontractors to perform the work using the City's subcontractor selection process. A. Preconstruction phase services by the CMAR may include the following: o provide detailed cost estimating and knowledge of marketplace conditions o provide project planning and scheduling o provide for construction phasing and scheduling that will minimize interruption to City operations o provide alternate systems evaluation and constructability studies o advise City on ways to gain efficiencies in project delivery o provide long-lead procurement studies and initiate procurement of long-lead items o assist in the permitting processes o participate with the City in a process to set a goal for local and SBE participation and implement the local and SBE process o protect the City's sensitivity to quality, safety, and environmental factors o advise City on choosing green building materials. B. Construction phase services by the CMAR may include: o construct, replace, or rehabilitate water mains as listed in the Section II - Scope of Work. o select subcontractors/suppliers for this project o prepare a Guaranteed Maximum Price (GMP) proposal that meets the approval of the City o coordinate with various City of Phoenix departments, other agencies, utility companies. The GMP must be submitted in MAG or CSI format, or it will not be accepted WMR ORANGEWOOD AVE TO NORTHERN AVE AND 12 TH ST TO 16 TH ST Page 2 of 14 PROJECT NO. WS85509037 CMAR RFQ Rev. 2/25 o arrange for procurement of materials and equipment o schedule and manage site operations o bid, award, and manage all construction related contracts while meeting City bid requirements including the local and SBE participation goal o provide quality controls o bond and insure the construction o address all federal, state and local permitting requirements o deal with City issues o maintain a safe work site for all project participants Use of UNIFIER, an Application Service Provider (ASP) web-based project management database, may be required. The following information provides a guideline for utilization. Any questions related to the requirements of UNIFIER should be directed to the Project Manager. o The CMAR will be required to maintain all project records in electronic format. o The City provides an ASP web-based project management database which the CMAR will be required to utilize in the fulfillment of the contract requirements. o The CMAR shall provide a computerized networked office platform with broadband internet connectivity. o UNIFIER training will be provided through the City of Phoenix to firms under contract.

Post-Bid

Water / Sewer

$75,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
32
Bidding Soon
1,080
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

August 11, 2025

Project location map

Multiple Locations, Phoenix, AZ


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.