BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2025 at 8:00 PM

Updated June 7, 2025

Renovation of a playground / park / athletic field in Santa Clarita, California. Completed plans call for the renovation of a playground / park / athletic field.

RFB-IS-25200790-3 PROCUREMENT FOLDER : 2986717 WRITTEN QUESTION DUE: 03-14-25 Respondents May Submit Written Questions Regarding This Rfb by E-mail to the Purchasing Analyst Identified on Page 1 of This Solicitation. Please Forward All Emails to: Aarellanes@isd.lacounty.gov Respondents may submit written questions regarding this rfb by e-mail to the Purchasing analyst identified on page 1 of this solicitation. Please forward allEmails to: aarellanes@isd.Lacounty.Gov WRITTEN QUESTION DUE: 03-14-25 - WRITTEN QUESTIONS RELEASED DATE: 03-18-25 Summary of Work: Complete roof tear off Frew house: remove pitched and flat roof in its entirety. Complete roof tear off adjacent detached storage building (detached from Frew house). Re-roof Frew house / storage building with existing salvaged tiles, and torch down roof system Frew House Pitched Portion: (Approximately:800 Sq Ft.) 1. Contractor will remove all existing tiles and SALVAGE the Frew house (Spanish tiles) for re-lay / re-set. 2. Contractor will install 2 layers of # 30 lb on the tile portion of roof and re-set the existing salvaged (Spanish) tiles. Tiles that need replacement will be matched with a similar Spanish tile (keeping the HISTORIC appearance). Such replacement tiles can be found at L.A Materials Inc. (112 w Jefferson Blvd, Los Angeles, CA 90007. The Spanish tile model number for L.A Roofing Materials is "SB01." This model is like in length, width, thickness, pattern, and color. Any replacement tile must be approved prior to installation. Frew House Flat Portion: Approximately 1,000 Sq Ft 1. Contractor will remove the existing layer(s) of flat roof to the Frew house. 2. Contractor will install a single layer of #75 base sheet to the flat roof deck. Contractor will use the manufacturer recommended fasteners (to meet fastening specifications). 3. Contractor will install a Poly-glass Polysmooth APP mid ply membrane according to all manufacturer specifications (torch welded). Contractor will install Poly-glass Poly-Fresko FR fire rated white torch CAP membrane (torch welded). Frew House Detached Storage Portion: Approximately 200 Sq Ft. 1. Contractor will remove the existing layers of flat roof detached storage room.

Bid Results

Playgrounds / Parks / Athletic Fields

$47,683.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
3
Bidding Soon
1,998
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2025

April 28, 2025

Project location map

24101 Newhall Ave, Santa Clarita, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.