BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 9, 2025 at 8:00 PM

Updated June 10, 2025

Demolition and site work for a municipal facility in Chapel Hill, North Carolina. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

**Per Addendum 2 the bid date has been extended from 04/22/25 to 05/06/25** For the demolition of the Odum Village buildings A. The CONTRACTOR is responsible for removing and disposing of asbestos containing materials from the project site. B. The CONTRACTOR shall use the Summary Tables and Asbestos Containing Materials Drawings for the twenty (20) buildings prepared by KCI Technologies, Inc. dated October 30, 2024 with the specifications as a guide in understanding the scope of work. The Summary Tables for each property is included as Attachment A.

Bid Results

Municipal

$846,000.00

Public - State/Provincial

Demolition, Site Work

28

15

8

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
147
Bidding Soon
1,726
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

June 1, 2025

Project location map

Multiple Locations, Chapel Hill, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.