BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 27, 2025 at 8:00 PM

Updated August 28, 2025

Site work for a power facility in Cold Lake, Alberta. Completed plans call for site work for a power facility.

Defence Construction Canada (DCC) invites general contractors to express their interest in providing all labour, materials, and equipment necessary to build a new 25KV underground high voltage power line replacement from DND-owned, existing substation (SUB-STN B651) on the base side of 4 Wing to both the TAC side and the Airfield. This Request for Expression of Interest (RFEOI) is the first step of a two-step solicitation process, the second step being the Tender Phase. Only the general contractors who will have responded to this RFEOI will be invited to submit a bid during the Tender Phase. The Defence of Canada Fighter Infrastructure (DCFI) Power Grid Modernization project is to construct a new 25KV underground High Voltage power line on the base side of 4 Wing to both the TAC side and the Airfield. The project is divided into four phases, however, only the first two phases are planned to advance currently to support FFCP/DCFI: Phase 1 (basis of award): Main high voltage electrical distribution system from the existing Atco east substation to a new east switching station, through the existing switching station to the new west switching station. Concrete encased duct bank throughout. Phase 2 (basis of award): New high voltage distribution system to the QRA, Waterleap area, TAC ramp, Hangarettes, and FSF tying into the phase 1 distribution system. Upgrade all distribution equipment for multiple buildings (approx. 13) throughout the base. Concrete encased duct bank throughout. High voltage feeds from phase 1 to the water/wastewater area Waterleap area connections to buildings Phase 3 (future anticipated planned change order): Second Atco substation installation on the west side of base c/w overhead power lines to the west switching station. Construct a new 25KV underground High Voltage power line from DND-owned substation B651 on the base side of 4 Wing to both the TAC side and the Airfield Phase 4 (future anticipated planned change order): Upgrade lighting throughout the Base- Medley, TAC, Waterleap, Kingsway, west switch station area The Rough Order Magnitude estimate for this Contract is $87,500.000.00. The Rough Order Magnitude estimate, including all future anticipated planned change orders (Phases 3 & 4), is $101,200,000.00 (Current Year $). Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Power Plant

$87,500,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
1
Bidding Soon
27
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2025

November 1, 2025

Project location map

4 Wing Cold Lake, Cold Lake, AB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.