Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 23, 2025 at 8:00 PM
Updated April 24, 2025
Site work for a communication facility in Stillwater, Oklahoma. Conceptual plans call for site work for a communication facility.
The Stillwater Utilities Authority (SUA), Stillwater, Oklahoma seeks qualifications and proposals from professional and qualified individuals and firms to provide plans, specifications, bidding, and construction phase services to rebuild 2.75 miles of 69kV transmission line and to demolish two circuits of 69kV transmission line totaling 1.45 miles. The SUA reserves the right to reject any or all submissions and to waive irregularities therein. It shall be clearly understood that any costs incurred by responding to this request for qualifications and proposals are at the Respondent's own risk and expense. The SUA shall not be liable for reimbursement to the Respondent for any expense so incurred, regardless of whether the proposal is accepted. The following outlines the general scope of construction and demolition activities anticipated for this project. These details serve as a preliminary framework, and the selected engineering firm will be responsible for refining the design, identifying any necessary modifications, and ensuring a comprehensive and technically sound approach. Any recommendations for alternative solutions, enhancements, or adjustments should be included in the proposal. General Construction Scope Replacement - Virginia & Jardot to Stillwater 69 Replace three 80' Class 1 dead-end wood poles with steel. Replace forty-five 80' Class 1 tangent wood poles with steel. Reconductor 2.75 miles from 636 AAC to 795 ACSR. Install OPGW and splice box at both ends (splicing by others). Replace all hardware and install new crossarms where present. Transfer all attachments to new structures. Demolition Scope Virginia - Perkins to Jardot Install new down guys at both ends. Remove 1 mile of 636 AAC conductor, shield wire, and associated hardware. Top 18 poles 2 feet above the crossarm and install split bolts. Lakeview - Husband to Perkins Install new down guy at the east end. Remove 0.45 miles of 636 AAC conductor, shield wire, and associated hardware. Top 7 poles 2 feet above the crossarm and install split bolts. Qualified respondents will be firms and/or individuals that are Oklahoma licensed professional engineers who specialize in electric transmission systems and demonstrate specific relevant experience with high voltage transmission line design, specifications, and construction management. ]Last day for questions - 5:30 PM April 23, 2025 Review and evaluation of responses - April/May 2025 Schedule interviews (if needed) - May/June 2025 Notification of selection - June/July 2025 Evaluators will make a recommendation to the General Manager and/or SUA Trustees as appropriate under City procurement policy. The General Manager/SUA Trustees will make the final selection. The General Manager and/or SUA Trustees reserves the right to reject all proposals, or parts of proposals as may be in the best interests of the SUA. The method of Contractor Selection has not been Determined at this time.
Conceptual
Communication
$250,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2026
Multiple Locations, Stillwater, OK
Related To This Project
Stillwater, OK
Bid Date: Apr 09 2025
Stillwater, OK
Bid Date: Apr 18 2025
Stillwater, OK
Bid Date: Aug 04 2020
Stillwater, OK
Bid Date: Apr 21 2025
Stillwater, OK
Bid Date: Apr 29 2025
Stillwater, OK
Bid Date: Apr 29 2025
Stillwater, OK
Bid Date: Apr 29 2025
Stillwater, OK
Bid Date: Jun 18 2025
Stillwater, OK
Bid Date: Apr 18 2025
Stillwater, OK
Bid Date: Apr 04 2025
Stillwater, OK
Bid Date: Apr 09 2025
Stillwater, OK
Bid Date: Mar 26 2025
Stillwater, OK
Bid Date: Mar 12 2025
Stillwater, OK
Bid Date: Apr 30 2025
Stillwater, OK
Bid Date: Mar 20 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
