BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 29, 2025 at 8:00 PM

Updated April 4, 2025

Renovation of a mixed-use development in Steeleville, Illinois. Completed plans call for the renovation of a educational facility.

High School Gym Floor Replacement and Stage Floor Sand/finish All prospective bidders must submit a proposal for all three bid opportunities and attend a mandatory pre-bid meeting. Bid #1: New Gymnasium Floor A. Install Hardwood Floor System including, but not limited to the following: a. 3/8 " Neoprene Pads b. (2) Two Layer 1/2 " Plywood c. 25/32" thick by 2 1/4 " wide Maple, graded #2 and better. Hardwood to be sanded smooth, and sealed with "Hillyard Trophy H2O Gym Floor Finish". See Part 4 below for description of finish application and number of coats. d. Stripe Game Lines to include IHSA regulation Basketball Court. Provide dimensioned diagram to Owner before starting striping work. Provide limited secondary linework for practice courts in a way that does not interfere with clarity of primary striping. e. Paint artwork to Include word "Warriors" on the end Courts, word "Steeleville" and state logo on the Side courts. f. Paint artwork to Include 3 color Warrior Logo in the Center Circle g. Stain the 3-point area in color of sample approved by the Owner. h. The gym floor is 33 meters x 28 meters in size. i. Owner to review and approve all paint and stain colors prior to starting. Contractors are responsible for visiting the site, and familiarizing themselves with any and all requirements for this work within the site conditions. B. Contractors are responsible for visiting the site, familiarizing themselves with any and all requirements for this work within the site conditions. Following removal of the existing floor, review site conditions and verify acceptable conditions for installation of new. C. All work (sand, game line painting, finish, etc.) to be performed by sole contractor awarded the contract. No Subcontractors are anticipated or acceptable. D. Contractor to isolate work areas from other portions of school to prevent dust, fumes, etc., from interfering with ongoing use of adjacent building areas. This may include air distribution ducts, doorways, plenum ceilings, etc. E. Contractor to be MFMA (Maple Flooring Manufacturers Association) member in good standing w/ Accredited employees working at this project site. F. Contractor shall have at least 10 years of experience in gym floor refinishing. Provide five examples of projects and references of similar projects completed within the past five years with the bid. G. Flooring contractor will coordinate their work with a bleacher contractor retained by the District under separate contract. Bleachers will be reduced by one row and reinstalled. They will not be removed from the gym. Steeleville CUSD #138 reserves the right to reject any and all bids, to waive any informality, or to accept any bid, which in the judgment of Steeleville CUSD #138, may be most advantageous to it

Post-Bid

Educational

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
96
Bidding Soon
1,380
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2025

May 5, 2025

Project location map

701 S Sparta St, Steeleville, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.