Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 29, 2025 at 8:00 PM
Updated April 4, 2025
Renovation of a mixed-use development in Steeleville, Illinois. Completed plans call for the renovation of a educational facility.
High School Gym Floor Replacement and Stage Floor Sand/finish All prospective bidders must submit a proposal for all three bid opportunities and attend a mandatory pre-bid meeting. Bid #1: New Gymnasium Floor A. Install Hardwood Floor System including, but not limited to the following: a. 3/8 " Neoprene Pads b. (2) Two Layer 1/2 " Plywood c. 25/32" thick by 2 1/4 " wide Maple, graded #2 and better. Hardwood to be sanded smooth, and sealed with "Hillyard Trophy H2O Gym Floor Finish". See Part 4 below for description of finish application and number of coats. d. Stripe Game Lines to include IHSA regulation Basketball Court. Provide dimensioned diagram to Owner before starting striping work. Provide limited secondary linework for practice courts in a way that does not interfere with clarity of primary striping. e. Paint artwork to Include word "Warriors" on the end Courts, word "Steeleville" and state logo on the Side courts. f. Paint artwork to Include 3 color Warrior Logo in the Center Circle g. Stain the 3-point area in color of sample approved by the Owner. h. The gym floor is 33 meters x 28 meters in size. i. Owner to review and approve all paint and stain colors prior to starting. Contractors are responsible for visiting the site, and familiarizing themselves with any and all requirements for this work within the site conditions. B. Contractors are responsible for visiting the site, familiarizing themselves with any and all requirements for this work within the site conditions. Following removal of the existing floor, review site conditions and verify acceptable conditions for installation of new. C. All work (sand, game line painting, finish, etc.) to be performed by sole contractor awarded the contract. No Subcontractors are anticipated or acceptable. D. Contractor to isolate work areas from other portions of school to prevent dust, fumes, etc., from interfering with ongoing use of adjacent building areas. This may include air distribution ducts, doorways, plenum ceilings, etc. E. Contractor to be MFMA (Maple Flooring Manufacturers Association) member in good standing w/ Accredited employees working at this project site. F. Contractor shall have at least 10 years of experience in gym floor refinishing. Provide five examples of projects and references of similar projects completed within the past five years with the bid. G. Flooring contractor will coordinate their work with a bleacher contractor retained by the District under separate contract. Bleachers will be reduced by one row and reinstalled. They will not be removed from the gym. Steeleville CUSD #138 reserves the right to reject any and all bids, to waive any informality, or to accept any bid, which in the judgment of Steeleville CUSD #138, may be most advantageous to it
Post-Bid
Educational
$200,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 3, 2025
May 5, 2025
701 S Sparta St, Steeleville, IL
Related To This Project
Steeleville, IL
Bid Date: Jul 18 2025
Steeleville, IL
Bid Date: Dec 09 2025
Steeleville, IL
Bid Date: Aug 02 2024
Steeleville, IL
Bid Date: Apr 11 2024
Steeleville, IL
Bid Date: Apr 02 2024
Steeleville, IL
Bid Date: Nov 06 2020
Steeleville, IL
Bid Date: Sep 17 2021
Steeleville, IL
Bid Date: May 12 2022
Wheaton, IL
Bid Date: Apr 15 2025
Skokie, IL
Bid Date: Apr 03 2025
Aurora, IL
Bid Date: Apr 03 2025
Normal, IL
Bid Date: Apr 10 2025
Homer Glen, IL
Bid Date: Apr 14 2025
Waukegan, IL
Bid Date: Apr 04 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
