BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 3, 2025 at 8:00 PM

Updated June 4, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Milford, Delaware. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Pre-Bid Meeting : Yes Microsoft TEAMS virtual meeting. Join on your computer or mobile app: Click here to join the meeting -->> Link in description Or call in (audio only) Or Join on a video conferencing device +1 302-504-8986,,282119965# Wilmington Tenant key: teams@sod.onpexip.com Phone conference ID: 996 856 038# Video ID: 119 221 967 5 Dbe Goal: 6% Disadvantaged Business Enterprise Goal Location: Sussex County These Improvements Are More Specifically Shown on the Location Map(S) of the Attached Plans. Description: The improvements consist of furnishing all labor and materials for the replacement of the existing movable swing span bridge with a single leaf bascule span bridge as well as replacement of the approach spans, roadway approaches, and the operator's house. Follow other incidental construction in accordance with the location, notes and details shown on the plans, and as directed by the Engineer. Completion Time: All work on this contract must be complete within 417Calendar Days. Extensions of contract time due to weather are specified in the Standard Specifications Section 108.7F, weather days. It is estimated a Notice to Proceed is issued such that work starts on or about September 8, 2026. Questions : E-MAIL TO; dot-ask@delaware.gov Questions regarding this project are to be e-mailed to the above address no less than six business days prior to the bid opening date in order to receive a posted response. Each proposal must be accompanied by a deposit of either surety bond or security for a sum equal to at least 10% of the amount bid. Performance-based Rating System - 29 Del.c. $6962 (C)(12)(a) Requires Deldot to Include a Performance-based Rating System for Contractors. The Performance Rating for Each Contractor Shall Be Used as a Prequalification to Bid at the Time of Bid. DE DOT - Replacement of BR 3-164 on SR 36 Cedar Beach Road

Bid Results

Bridges / Tunnels

$54,472,860.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

576

60

8

9

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
396
Active Projects
197
Bidding Soon
2,434
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2025

September 8, 2026

Project location map

Cedar Beach Rd, Milford, DE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.