EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 1, 2025 at 8:00 PM

Updated October 1, 2024

Site work and paving for a sidewalk / parking lot in Bloomington, Illinois. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The City adopted an Ordinance amending Chapter 16 of the City Code regarding public works contracts and project labor agreements. For all public works projects estimated in excess of $50,000 where public funds will be expended, the City of Bloomington shall require a project labor agreement unless it has been determined that a project labor agreement would not advance the City's interest of cost, efficiency, quality, safety, timeliness, skilled labor force, and labor stability and the City's policy to advance minority-owned or female-owned business, or businesses utilizing minority and female workers. The terms of any project labor agreement shall not exceed the economic standards established by the Illinois Prevailing Wage Act, as form time to time amended, nor contain any requirement of union membership of any contractor's employees or fair share payment by contractor's employees. Project Labor agreement shall not be required for contracts for private development between the City and developers involving private business development activities (e.g., incentive agreement with developers on private development projects). Questions Due to City: April 14, 2025, 12:00pm, All questions related to this Invitation to bid (ITB) shall be submitted in writing through online. Contact Information Carla Murillo Procurement Manager 109 E Olive Street Bloomington, IL 61701 Email: cmurillo@cityblm.org Phone: (309) 434-2277 Anticipated Award Date: May 12, 2025 A pre-bid meeting/site visit will not be held for this solicitation. It is highly suggested that interested parties view the project site and/or understand the requirements of the solicitation before submitting a response. The City of Bloomington reserves the right to reject any and all bids and to waive technicalities. Bid must be accompanied by a Bid guaranty which shall not be less than ten percent (10%) of the amount of the Bid. Bid guaranty may be a cashier's check, money order, certified bank check, or a surety bond. All guaranties, except surety bonds, will be deposited and reimbursement checks and surety bonds will be issued to unsuccessful bidders following the bid award. The successful bidder will be required to provide Performance and Payment Bonds in the amount equal to 100% of the contract price, within ten (10) business days after the bid award. The City of Bloomington requires all Bidders/Consultants doing business with the City not to discriminate on the basis of race, age, color, religion, gender, ancestry, national origin, marital status, mental or physical disability unrelated to ability, familial status or sexual orientation. The City of Bloomington reserves the right to reject any and all bids and to waive technicalities and to accept that bid which is to be considered to be in the best interest of the City. Any such decision shall be considered final. roject Description This project consists primarily of the following major work items: Approximately 98,500 SQ FT Sidewalk Removal Approximately 62,500 SQ FT P.C.C. Sidewalk 4" Approximately 30,000 SQ FT P.C.C. Sidewalk 6" Approximately 6,000 SQ FT P.C.C. Sidewalk 8" Approximately 11,000 SQ FT Sidewalk Reinforcement, Special Also includes curb and gutter replacement, sidewalk ramps, saw cutting / griding sidewalk, the 50 / 50 sidewalk program, and allowance pay items.

GC Bidding

Sidewalks / Parking Lot

$100,000.00

Public - City

Paving, Site Work

269

3

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Retaining Walls, Planting, Turf and Grasses, Seeding

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
52
Bidding Soon
608
All Active Projects
349
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2025

May 26, 2025

img_map_placeholder

Multiple Locations, Bloomington, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

FY26 Sidewalk, Curb and Gutter Replacement Program

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.