EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 29, 2025 at 8:00 PM

Updated October 1, 2024

This is a service / maintenance or supply contract in Camarillo, California. Contact the soliciting agency for additional information.

Supply all labor, equipment, materials, traffic control, and incidentals necessary to apply an herbicide root control product within sanitary sewer lines in order to kill the root growth present and to control re-growth without damaging the vegetation producing the roots. The agreement is for a 36-month period and may be extended by mutual agreement for up to two (2) additional one-year periods City reserves the right to open all bids submitted. Award of contract will go to the lowest responsible bidder. The right is reserved to reject any and all bids, to accept one part and reject the other, and/or award an order or orders as will best serve the interests of City. In the event of any such rejection, City shall not be liable for any costs incurred in connection with the preparation and submittal of a bid. Incomplete or non-conforming bids will be rejected. Any inquiries regarding the Notice Inviting Bids should be directed to Darrin Carter, Water Reclamation Superintendent, at 805-383-5665 or DCarter@cityofcamarillo.org. Questions pertaining to the bid documents are to be submitted through electronically. Bid Valid 90 Days Start/Delivery Date 07/01/2025 Project Duration 36-months Pre-Bid Meeting No Online Q&A No

Sub-Bidding

Water / Sewer

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
94
Bidding Soon
1,786
All Active Projects
788
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

July 1, 2025

img_map_placeholder

Multiple Locations, Camarillo, CA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Sewer Line Chemical Root Control

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.