This is a service / maintenance or supply contract in Tampa, Florida. Contact the soliciting agency for additional information.
This is a Request for Information for the City of Tampa's Water Department. The City of Tampa Water Department is requesting planning-level information pertaining to water treatment pilot plant equipment availability, feature options, cost, and delivery times. Pilot plant equipment may have the following characteristics: Approximate 50 gpm capacity Provide skids for the following unit operations separately: Raw water screening (surface water source) Coagulation (conventional & enhanced), flocculation, and sedimentation to include polymer addition functionality Coagulation (conventional & enhanced), flocculation, and ballasted sedimentation to include polymer addition functionality Suspended ion exchange inclusive of a regeneration system Ozonation Alkalinity / pH / stability adjustment to include options for using lime, caustic, and carbon dioxide Corrosion control chemical addition Filtration to accommodate modular media depth, mixed bed, air scour, and automated backwash Sodium hypochlorite and ammonia solution injection with contact chamber A variety of membrane-based treatment options Surge tank, flow meter, flow control, and pump for the purpose of adjusting hydraulic grade line between skids Cart-mounted composite sample collection rig to include a 5-gallon carboy (or similar to collect composite samples) and adjustable flow rate peristaltic pump / tubing. Disinfectant residual decay testing loops (pumps / surge tank for recirculating water through Owner provided distribution piping) Corrosion / stability testing loops for a variety of relevant metals & alloys (iron, copper, lead, etc.) Water conservation demonstration (visually demonstrate the effect of installing water conserving toilets/faucets/heads compared to conventional fixtures). Equipment should be constructed of materials that will not corrode, be BPA free, PFAS/PFOS/PFOA free, NSF compliant, etc. Hand, off, and auto control--hand control should be via panel mounted electro-mechanical devices and auto control should consist of providing a terminal junction box for terminating I/O field wiring on one side and providing terminals for connection to a process instrumentation and control system on the other side (input/output rack(s), programmable logic controllers, operator interface terminals, and SCADA system(s) to be provided by others) Instrumentation appropriate for each unit operation that aligns with water utility sector best practices. Products shall be consistent with Attachment A. Attachment A consists of Chapters 5, 6, 8, and 9 from Basis of Design Summary, I&C dated November 2023. Powered by 480 VAC or lower Bench scale coagulation, flocculation, and settling jar testing setup Bench scale ionic exchange column testing setup Bench testing equipment to measure mass, free and combined chlorine, dissolved ozone, pH, color, turbidity, particle size distributions, slurry density, etc. Bench testing equipment to measure moisture content in solids (oven, filtering ability, balances, etc.) Bench testing equipment to perform sieve analysis on filter and ion exchange media Furnishings for a small laboratory and sample preparation area Chemical storage, pumping, and dosing for sulfuric acid, ferric sulfate, polymer solutions, chloramination (sodium hypo solution + ammonia), lime, caustic, ozone with hydrogen peroxide quenching, carbon dioxide, orthophosphate, fluoride. Responses should include manufacturer cut sheets, shop drawings, itemized budget-level cost estimates (US Dollars, inclusive of design, fabrication, shipping, unloading, initial setup & startup services), sales contact information, and customer references (with customer contact information) for the above equipment. Responses may include additional information the responder deems relevant and helpful. Question Deadline 05/26/2025 at 5:00 PM ET.
Post-Bid
Water / Sewer
Public - City
Service, Maintenance and Supply
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2025
July 30, 2025
Multiple Locations, Tampa, FL
Related To This Project
Tampa, FL
Bid Date: May 29 2025
Tampa, FL
Bid Date: Apr 11 2025
Tampa, FL
Bid Date: Apr 18 2025
Tampa, FL
Bid Date: Mar 27 2025
Tampa, FL
Bid Date: Apr 04 2025
Tampa, FL
Bid Date: Apr 18 2025
Tampa, FL
Bid Date: Apr 17 2025
Tampa, FL
Bid Date: Apr 24 2025
Tampa, FL
Bid Date: Jun 24 2025
Tampa, FL
Bid Date: Apr 14 2025
Tampa, FL
Bid Date: Apr 07 2025
Tampa, FL
--
Tampa, FL
Bid Date: Apr 18 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.