BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2025 at 8:00 PM

Updated May 2, 2025

Renovation of a water / sewer project in West Jordan, Utah. Completed plans call for the renovation of a water / sewer project.

JVWCD desires to receive bids to perform the rehabilitation, reinstallation, and start-up of one (1) 250hp motor and pump at the 3145 West 11400 South booster station. Jordan Valley Water Conservancy District (JVWCD) desires to receive bids to perform the rehabilitation, reinstallation, and start-up of one (1) 250hp motor and pump at one of its Booster Stations. The pump and motor are currently located at the Nickerson Company shop. Nickerson originally pulled this pump and motor. SITE OF WORK: The location of the Booster Station is 3145 West 11400 South. There is no skylight access in this building. There is a crane inside the building that will move the motor and pump to the double doors on the south side of the building, the crane does not go outside the building. Bid bonds and Performance Bonds will be required for any bid with a total cost greater than $50,000. Work shall be completed within 90 calendar days from the date of acceptance of the Award of Purchase Order. Work shall be coordinated between the Contractor and the JVWCD, so the work progresses without interruption. All work performed at the pump station shall be performed between the hours of 7am and 6pm, Monday through Friday, unless prior arrangements between the Contractor and JVWCD are made. If work is not completed within the 90-day time frame, the Contractor agrees to accept liquidated damages in the amount of $100 per day. OWNER'S RIGHTS RESERVED: The JVWCD reserves the right to reject any or all bids, to waive any informality in a proposal, and to make awards in the interest of the Owner. SCOPE OF WORK: o The Contractor shall execute the work described herein. o The booster station DOES NOT have hatchways above each pump/motor assembly for removing or installing the pumps and motors by way of crane. There is a crane on the inside of the building that can move the pump and motor (note: the crane is inside the building only.) o The Contractor shall pull the rotating assembly from the peerless10AE14A Split Case Pump and rebuild with the following factory OEM parts: inboard bearing, outboard bearing, packing glands, gland hardware, casing gasket, shaft sleeves, set screws, O-rings, lip seals, packing, lantern rings, impeller key, casing wear rings, slingers, etc. o The pump needs a new impeller. o The Contractor shall clean up the Casing and Lid. Reinstall the rotating assembly, and replace the coupler insert. o The JVWCD desires to have a qualified motor repair firm inspect and rebuild the motor. This work shall include all recommended practices included in the EASA Standard AR100-2015 Recommended Practice for the Repair of Rotating Electrical Apparatus. Rebuild of the motor will include all necessary components that are identified during the inspection that need to be replaced to bring the motor within specifications when the motor was new. o The Owner shall be notified by the contractor when the motor is disassembled. The Owner shall be allowed to visit, review, and discuss findings with the motor repair firm while the motor is disassembled. o Reconditioning of the motor shall include, but not limited to: Replacement of the upper and lower motor bearings. Machine work on the bearing housings. Insulation coating of the windings and balancing of the rotor. If replacement of the windings is required, the contractor shall notify the owner and set up a meeting with the motor repair shop, owner, and themselves to review and discuss the findings before proceeding with repairs. The exterior color of the motor coating shall be the same as the existing motor color before repairs were performed. o The Motor needs new windings. o Once the pump and motor are reinstalled the contractor shall align the pump and motor, preform start-up, and adjust packing. o Contractor shall procure and pay for all required permits prior to the start of work. o Contractor is responsible to take all environmental actions as required by State and local entities pertaining to the work to be performed. o Contractor shall follow a written Occupational Safety and Health Administration (OSHA) compliant program, and other applicable programs, to ensure all safety measures are taken to protect public safety and the safety of workers at the site. o All information tags, site glass indicators, etc., shall be protected on the equipment and materials so the information remains clean and legible. o The Contractor shall be responsible for disconnecting the power cables and sensor wiring associated with the motor and shall reconnect the power cables and sensor wiring once the pump and motor are returned and reinstalled. o Additional information on the pump and motor are listed in the appendix.

Award

Water / Sewer

$26,951.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
61
Bidding Soon
998
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2025

April 30, 2025

Project location map

Multiple Locations, West Jordan, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.