Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 15, 2025 at 8:00 PM
Updated May 17, 2025
Renovation of an educational facility in Midland, Michigan. Completed plans call for the renovation of a educational facility.
SCOPE OF WORK: 1. Demo existing drinking fountains and installation of new bottle fill stations supplied by the district. All materials needed above and beyond what is supplied by the manufacturer is the responsibility of the contractor and should be included in the total price of this RFP. 2. Installation of new bottle fill stations to include all electrical and mechanical in locations specified in the included drawings. 3. The successful contractor must provide and submit to the State of Michigan plan review stamped engineered drawings of all mechanical and electrical work specified in this RFP. The district will provide original drawings upon request. 4. The drawings provided are for reference, any location changes must be cleared by the district. 5. The contractor is responsible for all measurements. 6. All State of Michigan codes must be followed for this RFP. 7. All manufacturers' installation requirements must be followed. Prevailing Wage Requirements In order to bid on this RFP a contractor must hold a state project registration and any sub-contractor working on this job must also hold a state project registration. The successful contractor is required by law to pay prevailing wage for this job. All documents pertaining to prevailing wage must be processed and the successful contractor must submit pay records for each pay period to the district and to the Michigan Department of Labor and Economic Opportunity. All other prevailing wage laws in the State of Michigan must be adhered to for this contract. Payment: Midland Public Schools will issue payment up to three weeks after final completion of work and final district inspection. The contractor may submit pay applications as work is completed and inspected by the district. Payment for pay applications can take up to three weeks to process. The Board of Education reserves the right to accept or reject any or all item(s) in the bid; to accept or reject any or all bid(s); to waive any informalities therein; or for any reason, to award the contract to other than the low bidder. If a unit price or extended price is obviously in error and the other is obviously correct, the incorrect price will be disregarded. Bid Security A Bid Security by a qualified surety authorized to do business in Michigan in the amount of five percent (5%) of the Base Bid shall accompany each proposal or proposal combination. The Bid Security may be in the form of a Bid Bond, Cashier's Check, or Money Order. Personal checks are not acceptable. Payment Bond Prior to the issuance of a purchase order authorizing commencement of this contract, and in cases before beginning work under the contract, the contractor(s) selected will qualify for, sign, and deliver to Midland Public Schools Business Office, an executed payment bond secured by the surety company. The bond will be in the amount of 5% of the contract. Work can begin after June 3, 2025. Day shift activities must end by August 08, 2025. The contractor may schedule with the district second or third shift work after this date. This will be at no additional cost to the district and should be figured into the total price of this RFP. All work should be completed by September 15, 2025. The district will work with the successful contractor to schedule areas to be completed first in order to ensure the least number of disruptions to students and staff. The successful contractor may setup times to visit the sites for additional information before the work start date.
Award
Educational
$129,829.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 10, 2025
June 3, 2025
3901 N Saginaw Rd, Midland, MI
Related To This Project
Midland, MI
Bid Date: Apr 22 2025
Midland, MI
Bid Date: Apr 29 2025
Midland, MI
Bid Date: May 09 2025
Midland, MI
Bid Date: Apr 01 2025
Midland, MI
Bid Date: Apr 22 2025
Midland, MI
--
Midland, MI
--
Midland, MI
--
Midland, MI
Bid Date: May 20 2025
Midland, MI
Bid Date: Apr 15 2025
Midland, MI
Bid Date: Apr 08 2025
Midland, MI
Bid Date: Apr 22 2025
Midland, MI
Bid Date: Mar 27 2025
Midland, MI
Bid Date: Mar 27 2025
Midland, MI
Bid Date: Apr 08 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
