Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 14, 2025 at 8:00 PM
Updated June 15, 2025
Site work and paving for a bridge / tunnel in Pontiac, Illinois. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Bridge repairs including paved shoulder replacement, expansion joint replacement, bearing replacement, PPC I-Beam Repairs, approach slab repairs, deck patching and other related construction items at dual Structures, 053-0007 EB and 053-0008 WB carrying O.R. 66 over the Vermilion River, 0.55 miles south of IL Route 23 in Pontiac. LOCATION OF PROJECT This project is located at Structure Nos. 053-0007 and 053-0008 carrying FAP Route 677 (IL 116) over the Vermilion River, 0.55 miles South of IL 23, in Pontiac, Livingston County. DESCRIPTION OF PROJECT This project consists of expansion joint replacement, full and partial depth deck slab repairs, approach patching, PPC I-Beam repair with fiber wrap and acrylic coating, bearing replacements at the abutments, erosion and slope wall repairs, traffic control, and pavement striping removal and replacement. Region : 2 District : 3 Federal Project # County(s) Livingston Key Route(s) FAP 673 Marked Route(s) : IL 116 Section(s) : (11-X-1-BR-1, 11X-1-BR)BRR State Job #(s) : C-93-088-24 PPS #(s) :0-02179-3009 0-02179-3010 Contract Specifics Completion Date: 75 Working Days VBP % 0.00 Questions not accepted as of April 15, 2025 04:30 PM Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 04, 2025. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. IL DOT - 065 - Bridge Repairs Including Paved Shoulder Replacement, Expansion Joint Replacement, Bearing Replacement - IL 116
Award
Bridges / Tunnels
$1,048,761.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 25, 2025
May 26, 2025
IL-116, Pontiac, IL
Related To This Project
Pontiac, IL
Bid Date: Apr 25 2025
Pontiac, IL
Bid Date: Apr 22 2025
Pontiac, IL
Bid Date: Apr 22 2025
Pontiac, IL
Bid Date: Apr 03 2025
Pontiac, IL
Bid Date: May 22 2025
Pontiac, IL
Bid Date: May 29 2025
Pontiac, IL
Bid Date: May 29 2025
Pontiac, IL
Bid Date: Jun 03 2025
CMP Culvert Entrance Removal and Replacement With a Precast Concrete Box Culvert on IL 116 - 5731995
Pontiac, IL
Bid Date: Apr 25 2025
Pontiac, IL
Bid Date: Feb 26 2025
Pontiac, IL
Bid Date: Mar 07 2025
Pontiac, IL
Bid Date: Feb 24 2025
Pontiac, IL
Bid Date: Feb 24 2025
Pontiac, IL
Bid Date: Jan 30 2025
Pontiac, IL
Bid Date: Jan 30 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
