EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 12, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a bridge / tunnel in Normal, Illinois. Completed plans call for site work for a bridge / tunnel.

Bridge Painting of 4 Structure locations on various routes in Mclean, Douglas, Dewitt and Piatt Counties. Region : 3 District : 5 VBP % 0.00 Federal Project # N/A County(s) Various Key Route(s) Various Marked Route(s) : Section(s) : D5 Bridge Painting 2025-2 State Job #(s) : C-95-031-25 PPS #(s) : 0-01378-5002 Contract Specifics 65 Working Days Questions not accepted as of April 15, 2025 04:30 PM Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashiers check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared not responsive, it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractors Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 04, 2025. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. IL DOT - 101 - Bridge Painting of 4 Structure Locations on Various Routes INTENT OF PROJECT The intent of this project is to clean and paint the structural steel of four (4) existing bridges for improved maintenance with a minimum disruption to the motoring public and adjacent environment. Location 1: S.N. 057-0069, I-55 Busn Loop / Veterans Pkwy (FAP 704) over UPRR & Old Route 66, 2.8 mile North of IL 9 in McLean County. Painting beam ends under joints only at South abutment, Pier 4, and North abutment. Location 2: S.N. 021-0060, US 45 (FAS 1671) over UPRR & Decatur and Eastern RR, west edge Tuscola in Douglas County. Painting beam ends only. Integral abutments. Location 3: S.N. 074-0086, US 150 (FAS 1517) over NSRR, Mansfield, in Piatt County. Painting beam ends only. Integral abutments. Location 4: S.N. 020-0020, IL 54 (FAP 71) over Salt Creek, 2 miles East of Kenney in Dewitt County. Painting beam ends only. DESCRIPTION OF WORK Locations 1 thru 4: Clean all structural steel to SSPC SP10 (near white blast), prime, and paint per individual location. Contain and dispose of all lead waste residue from structure 020-0020, and all non-lead waste residue from structures 057-0069, 021-0060, and 074-0086 located in various counties in District 5.

Sub-Bidding

Bridges / Tunnels

$600,000.00

Public - State/Provincial

Site Work

45

6

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Paint Cleaning, Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets, HVAC Air Cleaning Devices
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 26 - Electrical

Division 26 - Electrical

Lighting, Exterior Lighting
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Plants, Ground Covers
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
72
Bidding Soon
754
All Active Projects
380
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2025

May 26, 2025

img_map_placeholder

Multiple Locations, Normal, IL


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bridge Painting of 4 Structure Locations on Various Routes

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.