EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 31, 2025 at 8:00 PM

Updated October 1, 2024

Site work for a road / highway in Burlington Township, Pennsylvania. Completed plans call for site work for a road / highway.

The Description and Location of This Project is as Follows: Replace Existing Guide Rail and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 2023, Section Cgr, in Bradford County Asylum Township From Approximately 0.7 Miles West of Intersection With State Route 187 at Segment 0500 Offset 1000 to Approximately 1.7 Miles East of State Route 187 Segment 0470 Offset 0000. Project Cost Range: $100,000.00 - $199,999.99 Federal Project Status: PENNDOT Oversight Non-NHS DBE: 9% Structure Work: 0.00% Pre-Bid Meeting: None Anticipated NTP: 07/07/2025 Wage Rates: Yes Required Completion: 08/26/2025 Prequalification Requirement: Yes State Type of Work: Guide Rail Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PADOT: NTIER Guide Rail Upgrade

Sub-Bidding

Roads / Highways

$200,000.00

Public - State/Provincial

Site Work

11

5

2

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
59
Bidding Soon
758
All Active Projects
383
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2025

July 7, 2025

img_map_placeholder

State Rte 2023, Burlington Township, PA

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

NTIER Guide Rail Upgrade

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.