BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 8, 2025 at 8:00 PM

Updated May 9, 2025

Remodeling of an educational facility in New York, New York. Completed plans call for the remodel of a educational facility.

11th Floor Lecture Hall Remodel. Contract Term: 90 Calendar Days After the Contract Approved Date. Question Deadline 04/08/2025 at 10:00 AM ET Any questions after the walk-through, please email directly to Ting yleeshue@sunyopt.edu Bids must be submitted in duplicate in accordance with the instructions contained in the Information for Bidders. Security will be required for each bid in an amount not less than five (5) percent of the Total Bid. It is the policy of the State of New York and the State University of New York to encourage minority business enterprise participation in this project by contractors, subcontractors and suppliers, and all bidders are expected to cooperate in implementing this policy. The State University of New York reserves the right to reject any or all bids. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 18.9% Women Owned Sub-Contracting Goal: 11.1% Service-Disabled Veteran-Owned Business Contracting Goal: 6% Disadvantaged Owned Sub-Contracting Goal: 0% This renovation project is for the 11th Floor Lecture Hall, which current space is approximately 500 square feet and primarily used for small classes. The College needs to expand the space to accommodate 25-30 students and enhance the learning environment. The project includes expanding the classroom by incorporating the 135-square-foot storage area; as well as, refreshing and updating the adjacent Faculty/Staff pantry (Room 1117). The scope of work includes, but is not limited to, the following: o Demolition of the existing ceiling, lighting, diffusers, return grille, storage space, walls, door & frame, window shade, carpet, countertops, cabinetry, and other components. o Construction of new glass entry door openings. o Installation of a new ceiling, lighting, flooring, walls, diffusers, return grille, kitchen countertop, sink, faucet, cabinetry, and more. Page NB-2 of NB-2 SUNY Procedure 7554 Rev. June 2024 o Patching and painting the entire space. o Upgrading electrical wiring, conduits, lighting, and outlets. o Installation of new AV electrical power, switches, and outlets. o Installation of a new radiator cover and window shade. o Other elements specified in the drawings and project documents. The work to be done under the Contract, in accordance with the Contract Documents, consists of performing, installing, furnishing and supplying all materials, equipment, labor and incidentals necessary or convenient for the construction of Project Number 010325S, titled 11 th Floor Lecture Hall Remodel and carry out all of the duties and obligations imposed upon the Contractor by the Contract Documents. Natalie Rebuck Architecture PLLC is the Architect/consultant for this project and will be involved throughout the construction process, including issuing the final punch list. The primary scope of work for this project includes, but is not limited to, the following: o Demolition of the existing ceiling, lighting, diffuser, return grille, storage space, walls, door & frame, window shade, carpet, countertop, cabinetry, and other elements in the Lecture Hall, which is Room 1118A-Storage Space and Room 1117-Pantry. o Installation of a new ceiling, lighting, flooring, walls, diffuser, return grille, kitchen countertop, sink, faucet, cabinetry, and other fixtures. o Patching and painting as entire space. o Installation of new electrical wiring, conduits, lighting, and outlets. o Installation of new AV electrical power, switches, and outlets, if required. o Installation of a new radiator cover and window shades. The existing 11th Floor Lecture Hall space is approximately 500 square feet and is primarily used for small classes. The current condition of the space is suboptimal, featuring a 1'x1' spline ceiling, outdated electrical fixtures, severely worn carpeting, and a lack of audio-visual equipment. Below are pictures showing the current conditions of the 11th Floor Lecture Hall from various angles.

Post-Bid

Educational

$250,000.00

Public - State/Provincial

Remodeling

11

10

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,019
Active Projects
565
Bidding Soon
7,689
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.