BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 11, 2025 at 8:00 PM

Updated July 15, 2025

Site work and new construction of a water / sewer project in Haines City, Florida. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

**As of July 11,2025, this project has not yet been awarded. The project is expected to be awarded within next week** **As of June 16, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** City of Haines City620 East Main Street Haines City, Florida 33844Invitation to Bid Utility Services Master Lift Station No. 22ITB #25-14The City of Haines City, Florida, is requesting bids from qualified firms to furnish the goods and/or services identified in the specifications document. Scope of Work: The Work of this Project is generally described as the partial demolition of Lift Station (LS) No. 22and construction services for the new Haines City Master Lift Station (MLS) No. 22.The project includes:1. Demolishing part of LS No. 22 to include removing both pumps, piping, valves, supports, electrical controls, all panels, conduit, wire, utility services, all relocated boxes, plumbing, electrical wiring, and appurtenances.2. Constructing MLS No. 22 in a new location with a new wet well, master manhole, concrete slab, retaining wall, access drive, fencing, transmission line tie-in, new submersible pumps, piping, valving, controls, and electrical appurtenances including power supply control panel, power meter, surge protection, main breaker panel, disconnects, transformer, switches, relays, floats, and accessories meeting the Citys design standards.3. Installing a new doghouse master manhole and connecting it with the new wet well and existing gravity collection system.4. Installing a new radar level sensor, float switches, a light pole with a light-emitting diode (LED)fixture, adjustable-speed drives (ASDs) on each of the three pumps, meter disconnect, main breaker, automatic transfer switch (ATS) enclosure, demarcation panel, load center, test well, cabling, and associated accessories.5. Installing ductwork, drain piping, power, and potable water for a future odor-control system for MLS No. 22 to treat foul air from the lift station wet well and master manhole.6. Purchasing and installing a new diesel-powered bypass pump. The City reserves the following rights: to waive informalities in any bid/proposal/quote; to reject any or all bids/proposals/quotes or portions of bids/proposals/quotes; to accept a bid/proposal/quote or portions of bids/proposals/quotes deemed to be in the best interest of the City; and to negotiate orref use to negotiate with any offer. Question Deadline 04/18/2025 at 5:00 PM ET Questions regarding this bid must be received through written email or faxed inquiries directed to the designated Purchasing Coordinator

Bid Results

Water / Sewer

$200,000.00

Public - City

New Construction, Site Work

44

19

2

10

Subscribe For Documents

81 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
395
Active Projects
164
Bidding Soon
2,742
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2025

June 16, 2025

Project location map

To Be Determined, Haines City, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.