Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 31, 2025 at 8:00 PM
Updated April 18, 2025
Site work for a water / sewer project in Charleston, South Carolina. Completed plans call for site work for a water / sewer project.
The Commissioners of Public Works of the City of Charleston, South Carolina, is requesting interested Contractors complete and submit an Application for Prequalification for providing all labor, equipment, and materials necessary for construction of the West Ashley Transmission Main Extension Project located in Charleston, South Carolina between Highway 61/Ashley River Road and Main Road, paralleling Bees Ferry Road and the CSX railroad right-of-way. The Work to be performed consists of approximately 18,500 linear feet of water main comprised of 36-inch, 30-inch, 24-inch, 16-inch, 12-inch, 8-inch and 6-inch DIP in both Charleston County and the City of Charleston municipal boundaries, predominantly within private easements. Included in this work is approximately 2,500 linear feet of 42-inch Horizontal Direction Drill and 950 linear feet of 54-inch steel casing by Jack and Bore. All work within the scope of the Project that is to be installed by horizontal directional drill must be performed by a Horizontal Directional Drill (Sub) Contractor pre-qualified by CWS for this project. Applications for Prequalification of Bidders are available by contacting the office of Ardurra Group Inc. at 843-798-9141 or by email at wcherry@ardurra.com. Please direct all questions to William Cherry, P.E.. Neither the Owner nor Engineer has any responsibility for the accuracy, completeness, or sufficiency of the Application, including any Addenda, obtained from any other source. The Owner will not accept bids from Contractors who fail to submit timely applications for prequalification or from Contractors who fail to prequalify. The project will be bid at a later date in accordance with Charleston Water System's procurement requirements and the project bid documents. Bids are tentatively scheduled to be opened in June of 2025.
Post-Bid
Water / Sewer
$500,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 17, 2025
May 16, 2025
Multiple Locations, Charleston, SC
Related To This Project
Charleston, SC
Bid Date: Apr 14 2025
Charleston, SC
Bid Date: Apr 21 2025
Charleston, SC
Bid Date: Apr 17 2025
Charleston, SC
Bid Date: Apr 10 2025
Charleston, SC
Bid Date: Apr 23 2025
Charleston, SC
--
Charleston, SC
Bid Date: Apr 23 2025
Charleston, SC
--
Charleston, SC
Bid Date: Apr 24 2025
Charleston, SC
Bid Date: Apr 09 2025
Charleston, SC
Bid Date: Apr 23 2025
Charleston, SC
Bid Date: Apr 11 2025
Charleston, SC
Bid Date: Apr 04 2025
Charleston, SC
Bid Date: Apr 17 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
