BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 31, 2025 at 8:00 PM

Updated April 18, 2025

Site work for a water / sewer project in Charleston, South Carolina. Completed plans call for site work for a water / sewer project.

The Commissioners of Public Works of the City of Charleston, South Carolina, is requesting interested Contractors complete and submit an Application for Prequalification for providing all labor, equipment, and materials necessary for construction of the West Ashley Transmission Main Extension Project located in Charleston, South Carolina between Highway 61/Ashley River Road and Main Road, paralleling Bees Ferry Road and the CSX railroad right-of-way. The Work to be performed consists of approximately 18,500 linear feet of water main comprised of 36-inch, 30-inch, 24-inch, 16-inch, 12-inch, 8-inch and 6-inch DIP in both Charleston County and the City of Charleston municipal boundaries, predominantly within private easements. Included in this work is approximately 2,500 linear feet of 42-inch Horizontal Direction Drill and 950 linear feet of 54-inch steel casing by Jack and Bore. All work within the scope of the Project that is to be installed by horizontal directional drill must be performed by a Horizontal Directional Drill (Sub) Contractor pre-qualified by CWS for this project. Applications for Prequalification of Bidders are available by contacting the office of Ardurra Group Inc. at 843-798-9141 or by email at wcherry@ardurra.com. Please direct all questions to William Cherry, P.E.. Neither the Owner nor Engineer has any responsibility for the accuracy, completeness, or sufficiency of the Application, including any Addenda, obtained from any other source. The Owner will not accept bids from Contractors who fail to submit timely applications for prequalification or from Contractors who fail to prequalify. The project will be bid at a later date in accordance with Charleston Water System's procurement requirements and the project bid documents. Bids are tentatively scheduled to be opened in June of 2025.

Post-Bid

Water / Sewer

$500,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
60
Bidding Soon
760
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

May 16, 2025

Project location map

Multiple Locations, Charleston, SC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.