Published April 25, 2025 at 8:00 PM

Updated April 26, 2025

Renovation of an educational facility in Sparks, Nevada. Completed plans call for the renovation of a educational facility.

Scope of Work: Remove existing isolation gate valves and replace with new ball valves. Question Deadline: Tue 04/15/2025 4:30 PM* The physical work is to be commenced upon issuance of Notice to Proceed . Work shall be completed on or before August 1, 2025. Low $86,400.00 High $105,600.00 Each individual bid shall be accompanied by a surety company issued Bid Bond or by a Certified or Cashier's Check made payable to the Washoe County School District, in the amount of not less than five percent (5%) of the bid, said amount to be forfeited to WCSD, should the Contractor to whom the Contract is awarded fail to enter into the Contract in accordance with the Contractor's bid and any other contract documents and furnish the required bonds within ten (10) days after the delivery of notice of such award. Bid Bonds, upon request, or deposits of the unsuccessful bidders will be returned upon signing of Contract, or within forty-five (45) days from bid date, whichever is earlier. Contractor must agree that Owner may retain from the monies due the Contractor One Thousand Dollars ($1,000) per day (Liquidated Damages) as a direct result of the Contractor's delay or for not completing the project in the required time allowance plus approved time extensions. The right is reserved by WCSD to reject any and all bids or accept the bid, which is deemed by WCSD to be in the best interest of the school district. WCSD also reserves the right to waive any irregularities and/or informalities in the submitted bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work shall include the furnishing of all labor, tools, equipment, material, transportation and the performance of all operations required for the Replace Isolation Valves at George L. Dilworth Middle School at the site(s) and associated work as specified herein and shall include the cleanup and removal from the site(s) of all debris resulting from the operations performed. It shall also be the Contractor's responsibility to take all necessary safety precautions and to furnish barricades and/or other safety measures as required. FCIS#: 310-ME-0051 JL#: 69165 WCSD PROJECT#: 25-165-310-0

Award

Educational

$69,822.00

Public - County

Renovation

9

12

2

8

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
21
Bidding Soon
372
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.