Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 13, 2025 at 8:00 PM
Updated December 18, 2025
Site work for a civil project in Edmonds, Washington. Completed plans call for site work for a water / sewer project.
Cost Estimate: $1,600,000.00 - $1,950,000. Question Deadline 04/15/2025 at 5:00 PM PT Questions requiring a response are due no later than 5 pm, seven (7) calendar days prior to the bid opening date. All questions regarding this solicitation shall be directed to the Project Representative, David MacDonald; (425) 743-4605 or e-mail at dmacdonald@awwd.com. The work under this Contract includes, but is not limited to: Installation of approximately 1,300 linear feet of buried storm sewer main (various sizes). Installation of approximately 26 catch basins, and a CDS water quality pretreatment unit. Placement of approximately 1,500 tons of hot mix asphalt and 1,500 tons of crushed surfacing top course, to rehabilitate the existing pavement at Reservoirs 2 and 3 as well as provide full-depth repair of portions of the administration building parking lot. Installation of approximately 1,800 square yards of geotextile, and performance of crack sealing and fog sealing, as additional measures to rehabilitate the administration building parking lot. Trenching and installation of approximately 5,900 linear feet of conduit and appurtenances. Removal/abandonment of existing roadway and civil elements (including approximately 110 cable anchors and approximately 10 linear feet of roof drain asbestos pipe). Bids shall be submitted in accordance with the Contract Documents. Bids shall constitute offers to the District, which shall be binding for 60 calendar days from the date of bid opening. The District further reserves the right, but without obligation, to waive informalities and irregularities. No bid will be considered unless accompanied by a bid guaranty (certified or cashier's check, surety bond, or postal money order) payable to Alderwood Water & Wastewater District in an amount not less than five percent (5%) of the Total Bid Price. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Water / Sewer
$1,358,800.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 22, 2025
June 23, 2025
158th St SW, Edmonds, WA
Related To This Project
Edmonds, WA
Bid Date: Sep 22 2020
Edmonds, WA
Bid Date: May 05 2025
Edmonds, WA
Bid Date: May 20 2025
Edmonds, WA
Bid Date: May 27 2025
Edmonds, WA
Bid Date: May 20 2025
Edmonds, WA
Bid Date: Jun 03 2025
Edmonds, WA
Bid Date: Jun 16 2025
Edmonds, WA
Bid Date: Mar 18 2025
Edmonds, WA
Bid Date: Jan 29 2025
Edmonds, WA
--
Edmonds, WA
Bid Date: Dec 10 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
