BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 31, 2025 at 8:00 PM

Updated April 1, 2025

Renovation of an educational facility in Westport, Connecticut. Conceptual plans call for the renovation of a educational facility.

A. The following services are required of the architect and/or engineer: The selected firm shall provide the necessary drawings and specifications to address: 1. The replacement of the existing cooling towers 2. Reduction in cooling tower noise levels 3. Means of safe access to the top of the new cooling towers for service & maintenance 4. The necessary modifications to the condenser water system pumps and piping configuration to support the simultaneous operation of both existing chillers on site 5. The necessary modifications or repairs to the steel structure supporting the cooling towers 6. The necessary controls and control sequences to integrate cooling tower operation with existing chiller plant operations 7. Implementation of condenser water temperature reset control for energy conservation 8. Pricing from a professional estimating agency to implement the project broken down by labor and material costs per task. o The selected firm shall provide all associated drawings, specifications and bid package documentation required of the contractor to perform the corrective work. o Note that the project will be subject to Prevailing Wage Rates. B. Attached are three exhibits, as part of this RFP, which are provided for reference: o Exhibit 3-Building structural drawing set dated 1966. o Exhibit 4-Building mechanical drawings from April 2001 renovation bid set. o Exhibit 5-Pictures of existing cooling tower dated March 2024. C. The following systems are to be incorporated into the condenser water system upgrades and design based on a prior review with the district: o Cooling Towers, including dunnage, twenty (20) year rust protection dunnage coating, stainless steel sumps, whisperer (whisper quiet fans), polymer resin infill, vibration isolators, piping and control valves, lightening protection and safe means of access to all portions of the towers for service & maintenance o Condenser Water System piping configurations o Condenser Water System pumps o Cooling Tower Power and Control System o Control Accessories

Conceptual

Educational

$450,000.00

Public - City

Renovation

18

4

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
291
Active Projects
42
Bidding Soon
4,313
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2026

Project location map

170 Riverside Ave, Westport, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.