BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2025 at 8:00 PM

Updated March 29, 2025

Site work and renovation of a civil project in Westport, Connecticut. Conceptual plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

A. The following services are required of the architect and/or engineer: o The selected firm shall provide the necessary drawings and specifications to address the following: 1. The assessment, inlet re-piping and replacements of the following existing hydronic inline pumps 2. The necessary replacement of all outdated controllers serving pumps located in Area J mechanical spaces of the school and provide controls sequences to integrate with existing controls on school campus. 3. Evaluate, design and specification to replace all cartridge type valves serving fan coil units (FCUs) with direct digital control (DDC) valves throughout the school. 4. Investigate flow issues reported in Area H of the school and provide water side balancing for the schools heating hot water system. 5. Pricing from a professional estimating agency to implement the project broken down by labor and material costs per task. o The selected firm shall provide all associated drawings, specifications and bid package documentation required of the contractor to perform the work. o Note that the project will be subject to Prevailing Wage Rates. B. Attached are exhibits, as part of this RFP for reference and additional information, o Exhibit 3 - Mechanical schedule o Exhibit 4 - FCU Controls and Schedule C. The following systems are to be incorporated into the pumps and controls upgrades and design based on a prior review with the district: o Inline hydronic pump design of inlet re-piping and any necessary pump replacements o Pump Power and Control System. Update old pump controllers o Water side balancing. Investigation of hot water flow issues and remedial recommendations. o Heating Hot Water System Balancing o Design FCU valve replacement with DDC valve Deadline for Questions: Thursday, April 10, 2025 at 1:00 p.m.

Conceptual

Water / Sewer

$100,000.00

Public - City

Renovation, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
840
Active Projects
389
Bidding Soon
6,053
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2026

Project location map

70 North Ave, Westport, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.