Site work and paving for a mixed-use development in Jamestown, New York. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Reference Number 0000381329 This project consists of modifying and constructing concrete structures such as curbs, gutters, brick pavement, sidewalks, ande driveway approaches as part of the partial reconstruction of Hall Avenue within the City of Jamestown. Purchase Type One Time Only- Delivery Date:05/16/2025 Question Acceptance Deadline 04/04/2025 03:00 PM EDT Questions are submitted online Yes Each proposal must be accompanied by a bid bond in the amount of ten percent (10%) of the total bid price, conditioned that, if the proposal is accepted, the Contractor will enter into a contract for the same, and will execute any such further security as may be required for the faithful performance of the contract. No bidder may withdraw his bid within 45 days of the date of the receipt of bids. The right to reject any and all bids, to waiver any inconsistencies in, or to make any award to other than the low bidder, should it be deemed to be in the best interest of the City of Jamestown, and in accordance with the law, are herewith reserved. A. The "Work" under this Contract is intended to include all labor, materials, equipment, and services necessary to provide and accomplish the construction of concrete structures within the street reconstruction project limits. The concrete structures will be curbs, gutters, steps, sidewalks, driveway aprons and other flatwork. All excavation, removal and landscape restoration will be completed by the contractor. The curb and gutter is to be replaced with the soldier course of brick remaining. B. Driveway aprons, sidewalks passing through a driveway, sidewalk ramps, or within the downtown area, shall be 6 inches thick. All other flat work shall be 4 inches thick, or as directed by the Engineer. C. The work will construct new concrete structures. Old, existing concrete structures will be removed and disposed of by the contractor. The subbase to which the stone and concrete will be placed, will be graded and leveled by the contractor. D. The Contractor will be responsible for constructing the concrete structures to the line and grade specified by the Owner, to the tolerances listed in the General and Supplementary Conditions. The Contractor is responsible for excavation, removal and disposal of all material as directed by the Engineer. Demolition of existing concrete where the new Automatic Transfer Switch and generator are to be placed. Provide and install one new generator pad and one new concrete pad for new ATS. Provide and install new wiring and conduit to connect new generator and ATS. . Anticipated start date: May 16, 2025. . Substantial completion by June 13, 2025. . Final completion of all work by June 20, 2025
Award
Roads / Highways
$233,800.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
6
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 11, 2025
May 16, 2025
Hall Ave, Jamestown, NY
Related To This Project
Jamestown, NY
Bid Date: Apr 24 2025
Jamestown, NY
Bid Date: Apr 23 2025
Jamestown, NY
Bid Date: Apr 30 2025
Jamestown, NY
Bid Date: May 13 2025
Jamestown, NY
Bid Date: May 26 2020
Jamestown, NY
Bid Date: May 07 2025
Jamestown, NY
Bid Date: May 29 2025
Jamestown, NY
Bid Date: May 15 2025
Jamestown, NY
Bid Date: Apr 24 2025
Jamestown, NY
Bid Date: Apr 17 2025
Concrete Work Street Reconstruction 2025 Clinton Street From Third Street To Fourth Street - 5728825
Jamestown, NY
Bid Date: Apr 16 2025
Jamestown, NY
Bid Date: Mar 31 2025
Jamestown, NY
Bid Date: Apr 02 2025
Jamestown, NY
Bid Date: Mar 26 2025
Jamestown, NY
Bid Date: Mar 31 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.