BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 27, 2025 at 8:00 PM

Updated August 28, 2025

Site work, outdoor lighting and renovation of a mixed-use development in Healdsburg, California. Completed plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; bridge / tunnel; transportation facility; bridge / tunnel; and for outdoor lighting for a transportation facility.

Project Description: This Progressive Design-Build project is for the Design and Construction of Civil, Structures, Systems, and Architectural Improvements for the Healdsburg Extension Project. The Healdsburg Extension Project is the extension of the SMART railroad and pathway system with the objectives of extending passenger rail service 9 miles to the North, constructing a station in the City of Healdsburg, CA, and extending the non-motorized pathway from the Town of Windsor to the City of Healdsburg where it will tie into the existing Foss Creek pathway within the railroad right-of-way. Questions Due Date Online Portal Deadline to submit Questions May 23rd 2025, 11:30 PM PDT Work includes, but is not limited to replacement of the existing track with new track, ties, ballast, and sub ballast; construction of a new center boarding platform to include SMART standard amenities, shelters, lighting, CCTV security cameras, card vending machine(s), real-time passenger signs, etc.; several bridge replacements or refurbishments, including a significant bridge crossing the Russian River; all new and existing grade crossings to be reconstructed, construction of a non-motorized bicycle and pedestrian pathway from Windsor to Front Street in Healdsburg, extension of SMARTs existing Enhanced Automatic Train Control (EATC) train control system, extension of SMARTs communication system to support a closed SMART network communication system, etc. Optional Work tasks are also included in this solicitation to further advance SMARTs rail and pathway system North from the City of Healdsburg, CA towards Geyserville, CA. Similar work elements to that of the Healdsburg Extension Project are included in these work tasks. Intent to Bid by Jun 30, 2025 2:00 PM PDT.

Award

Transportation Terminals

$600,000.00

Public - County

Outdoor Lighting, Renovation, Site Work

193

34

6

7

Subscribe For Documents

63 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
324
Active Projects
159
Bidding Soon
1,699
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2025

July 30, 2025

Project location map

Multiple Locations, Healdsburg, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.