BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 29, 2025 at 8:00 PM

Updated December 2, 2025

Site work for a water / sewer project in Wrentham, Massachusetts. Completed plans call for site work for a water / sewer project.

Project New Leaching Field, Wrentham Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Furnish and install new leaching field. Questions during the bidding period, regarding the accompanying plans and/or specifications, must be submitted to the Department at least eight (8) days before the bid opening. The Department will prepare addenda on or about the fourth day prior to the opening, containing interpretations of all questions raised which, in the opinion of the Department, require interpretation. All bidders of record will receive the addendum or addenda by certified mail. Description of Work The work consists of the referenced Project as set forth in the plans and specifications attached hereto. The contractor agrees to do and complete at his own expense all the work and furnish all the materials required to be done or furnished by him in the following plans and specifications in a proper, thorough, and workmanlike manner, in accordance with the terms of this contract. All plans, general and detail, are to be deemed a part of this contract, and the plans and specifications and contract are to be considered together, and are intended to be mutually complementary, so that any work shown on the plans, though not specified in the specifications, and any work specified in the specifications though not shown on the plans, is to be executed by the contractor as a part of this contract. Figured dimensions are to prevail over scale. All things which in the opinion of the Designer\Project Engineer may reasonably be inferred from the contract and plans are to be executed by the contractor under the terms of the contract and the Designer\Project Engineer shall determine whether the detail plans conform to the general plans and contract. The distribution of work is intended to be described under the appropriate trade and may be redistributed, except as directed herein, provided no controversy will arise among the trades and progress will not be delayed. The contractor shall be responsible to the Department for the acts and omissions of his subcontractors, if any, and of all persons directly or indirectly employed by him or them in connection with the work. The Table of Contents, titles, headings and marginal notes or sub-scripts contained herein are solely to facilitate references and in no way affect, limit or cast light on the interpretation of the provisions to which they refer.

Award

Water / Sewer

$19,999.00

Public - State/Provincial

Site Work

3

11

3

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
590
Active Projects
220
Bidding Soon
4,484
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2025

May 9, 2025

Project location map

345 Dedham St, Wrentham, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.