Renovation of a power facility in Lawton, Oklahoma. Conceptual plans call for the renovation of a power facility.
Construction of Fort Sill Power Generation and Smart Microgrid System A market survey is being conducted to determine if there are a reasonable number of interested small business concerns to set this future project aside for them. If your firm is a Small Business, certified HUBZone, 8A, Woman-Owned Small Business or Service-Disabled Veteran Owned Small Business and you are interested in this project please respond appropriately. Project Location: Fort Sill, Lawton, Oklahoma Project Description: The Design-Bid- Build (D/B/B) construction of a power generation and smart microgrid system with a base scope of a 10.3MW of natural gas reciprocating internal combustion engine (RICE - Generator 1) power plant, including a compressed air starting system, distribution feeders, paralleling switchgear, transformer, protective relays, shared load bank, medium voltage circuit breakers, SCADA system, reclosers and microgrid controls. This will be a design bid build project. The microgrid system will provide energy resilience for at least (14) days to mission critical functions utilizing fossil fuel to support Fort Sill. The system shall be capable of connecting to and disconnecting from the electric utility grid for exchange of power as well as islanding the installation from the electrical grid, shedding non-critical loads and providing emergency support to the IEWP identified critical facilities. The 10.3 MW RICE power plant (18.0 MW if Bid Option 1 is accepted, using two 9.0 MW generators) will be located within a weather-proof shelter on an elevated plot of open land to the southeast of Building 3933. The project involves installing a 6-inch natural gas branch line to service the new generation plant. Bid Options 2 and 3 are for (2) MW/MWh of BESS each. Bid options will be analyzed once bids are accepted for feasibility based on provided bid price and available funding. Contract duration is estimated at 720 calendar days. The estimated cost range is between $25,000,000.00 - $100,000,000.00. NAICS code is 237130. All interested Small Businesses, certified HUBZONE, 8A, Woman-Owned Small Business or Service-Disabled Veteran-Owned Small Business contractors should respond to this survey via email no later than Friday, 09 April 2025 at 3:00 PM Eastern Standard Time. Responses should include: Identification and verification of the company's small business status. Contractor's Unique Entity Identifier (UEI)) and CAGE Code(s). Documentation from the firm's bonding company showing current single and aggregate performance and payment bond limits. Description of Experience - Provide descriptions of your Prime contractor past experience on up to three (3) projects with greater than 95% construction complete or those projects completed within the last five years which are similar to this project in size and scope. Provide documentation demonstrating experience for construction of similar type buildings and managing multiple sub-contractors. Demonstrate experience including self-performing 15% of the construction. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, percentages and quality of performance. Projects similar in Scope shall include construction of a microgrid demonstrating at least three (3) of the following scope elements: Installation of Battery Energy Storage systems Installation of centralized generation to provide power to multiple buildings with controls Installation of electrical and telecommunication duct bank and controls for Microgrids Implementation of control systems for electrical peak shaving Projects considered similar in size shall include construction of at least one (1) of the following size elements: Installation & construction of small-scale power generator resources or storage technologies (distributed energy resources) to handle loads of at least 2 MW or greater. Installation of 2.4KV or higher electrical switchgear and necessary breakers for building or grid systems. Based on definitions above, for each project submitted include: Current percentage of construction complete and the date when it was or will be completed. Size of the project Scope of the project The dollar value of the construction contract The percentage of work that was self-performed as project and/or construction management services or physical construction type work. Must be at least 15% self-performed. Whether the project was design build or design/bid/build Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm's own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished. NOTE: Total submittal package shall be no longer than 8 pages. Please only include a narrative of the requested information; additional information will not be reviewed. Email responses to Jacob Pridemore at Jacob.s.pridemore@usace.army.mil. If you have questions, please contact Jacob Pridemore at Jacob.s.pridemore@usace.army.mil or 502-315-6228. This is NOT a Request for Proposal and does not constitute any commitment by the Government. Responses to this sources sought notice will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitation announcements separately from responses to this market survey. NOTICE: The following information is provided for situational awareness and is not required to respond to this Sources Sought. All contractors must be registered in the System for Award Management (www.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer - System for Award Management, which indicates "All payments by the Government under this contract shall be made by electronic funds transfer (EFT)." Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from http://www.SAM.gov. Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg. Please begin the registration process immediately in order to avoid delay of the contract award should your firm be selected. ALERT: You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration. Effective 29 June 2018, vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM. Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (known as DUNS). The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM. To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov). The Method of Contractor Selection has not been determined at this Time *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Hydroelectric Power Generation
$100,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2026
To Be Determined, Lawton, OK
Related To This Project
Lawton, OK
Bid Date: Apr 02 2025
Lawton, OK
Bid Date: Apr 16 2025
Lawton, OK
Bid Date: Apr 25 2025
Lawton, OK
Bid Date: Apr 23 2025
Lawton, OK
Bid Date: Apr 29 2025
Lawton, OK
Bid Date: Apr 23 2025
Lawton, OK
Bid Date: Mar 27 2025
Lawton, OK
Bid Date: Apr 01 2025
Lawton, OK
Bid Date: Mar 14 2025
Lawton, OK
Bid Date: Apr 15 2025
Lawton, OK
--
Lawton, OK
--
Lawton, OK
Bid Date: Feb 19 2025
Lawton, OK
Bid Date: Feb 04 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
RFQ Contractor - Fort Sill Power Generation and Smart Microgrid System
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.