Published March 27, 2025 at 8:00 PM
Updated March 28, 2025
Site work and paving for a mixed-use development in Bloomington, Minnesota. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Reconstruct Nicollet Avenue (CSAH 52) from 89th Street to American Boulevard in the City of Bloomington. Purpose & Description: The existing roadway (last reconstructed in 1962) is nearing the end of its useful life and warrants replacement. Routine maintenance activities (such as overlays and crackseals) are no longer cost effective in preserving assets. The roadway was originally constructed with concrete pavement, however, it has since been overlaid with bituminous material; resulting in premature surface cracking at joints. The existing sidewalk facilities are located immediately adjacent to the roadway; causing a feeling of discomfort for people walking. The curb has experienced settling, greatly diminishing its ability to collect water and define the roadway edge. Many intersections include ADA accommodations that do not meet current design requirements, presenting challenges for persons with limited mobility. In 2019, the county completed an overlay project along this section of Nicollet Avenue (CSAH 52) in coordination with a CenterPoint Energy gas main project. In addition to a new pavement surface, the roadway configuration was converted from a four-lane undivided design to a three-lane design in an effort to better facilitate driver turning movements and to provide traffic calming. Given the age and condition of roadway assets, the timing of this capital project will coincide with the service life extension provided by the overlay project. The proposed project will reconstruct existing assets, including: pavement, curb, storm water structures, sidewalk, bikeway, and traffic signals. Complete and Green Streets design strategies such as pedestrian crossing enhancements (curb extensions, raised medians, and crossing beacons), bikeway accommodations, and streetscaping features will also be considered as part of the project development process in an effort to benefit people walking, using transit, and biking in the area. Construction Q2 2027 - Q3 2028 Completion 2029 As of March 27, 2025 ,This project is included in the County's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$10,320,000.00
Public - County
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 1, 2027
Nicollet Ave, Bloomington, MN
Related To This Project
Bloomington, MN
Bid Date: Apr 22 2025
Bloomington, MN
Bid Date: Apr 10 2025
Bloomington, MN
Bid Date: Oct 30 2025
Bloomington, MN
Bid Date: Apr 24 2025
Bloomington, MN
Bid Date: May 02 2025
Bloomington, MN
Bid Date: May 02 2025
Bloomington, MN
Bid Date: May 15 2025
Bloomington, MN
Bid Date: May 15 2025
Bloomington, MN
Bid Date: Apr 11 2025
Bloomington, MN
Bid Date: Apr 14 2025
Bloomington, MN
Bid Date: Apr 15 2025
Bloomington, MN
Bid Date: Apr 24 2025
Bloomington, MN
Bid Date: Apr 08 2025
Bloomington, MN
Bid Date: May 16 2025
Bloomington, MN
Bid Date: Mar 25 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.