Published March 27, 2025 at 8:00 PM

Updated March 28, 2025

Site work and paving for a mixed-use development in Bloomington, Minnesota. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reconstruct Nicollet Avenue (CSAH 52) from 89th Street to American Boulevard in the City of Bloomington. Purpose & Description: The existing roadway (last reconstructed in 1962) is nearing the end of its useful life and warrants replacement. Routine maintenance activities (such as overlays and crackseals) are no longer cost effective in preserving assets. The roadway was originally constructed with concrete pavement, however, it has since been overlaid with bituminous material; resulting in premature surface cracking at joints. The existing sidewalk facilities are located immediately adjacent to the roadway; causing a feeling of discomfort for people walking. The curb has experienced settling, greatly diminishing its ability to collect water and define the roadway edge. Many intersections include ADA accommodations that do not meet current design requirements, presenting challenges for persons with limited mobility. In 2019, the county completed an overlay project along this section of Nicollet Avenue (CSAH 52) in coordination with a CenterPoint Energy gas main project. In addition to a new pavement surface, the roadway configuration was converted from a four-lane undivided design to a three-lane design in an effort to better facilitate driver turning movements and to provide traffic calming. Given the age and condition of roadway assets, the timing of this capital project will coincide with the service life extension provided by the overlay project. The proposed project will reconstruct existing assets, including: pavement, curb, storm water structures, sidewalk, bikeway, and traffic signals. Complete and Green Streets design strategies such as pedestrian crossing enhancements (curb extensions, raised medians, and crossing beacons), bikeway accommodations, and streetscaping features will also be considered as part of the project development process in an effort to benefit people walking, using transit, and biking in the area. Construction Q2 2027 - Q3 2028 Completion 2029 As of March 27, 2025 ,This project is included in the County's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$10,320,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
0
Bidding Soon
790
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2027

Project location map

Nicollet Ave, Bloomington, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.