Published April 3, 2025 at 8:00 PM

Updated October 1, 2024

Demolition, site work and addition to an educational facility in Cortland, New York. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility.

The Cortland Enlarged City School District invites sealed bids, in duplicate, for: PLUMBING For: Cortland Enlarged City School District 2024 Capital Project Barry Addition: Barry Primary School 20 Raymond Avenue Cortland, New York 13045. Prospective Bidders will be issued a maximum of two (2) sets each. Subcontractors, Material Suppliers, etc., will be issued a maximum of one (I) set each. Contract documents will be delivered via UPS Ground service upon request and receipt of an additional non-refundable delivery and handling charge, payable by separate check to Plan & Print Systems, Inc. Contact Plan & Print for shipping and handling costs. Any sets required in excess of the above-mentioned maximums are to be obtained directly by interested parties at the full cost of printing, at their cost, directly from Plan and Print Systems. Only complete sets will be issued. At the time the order is placed, plan holder shall advise Plan and Print Systems of status as to prime bidder, subcontractor, or material supplier and to trade affiliation. It is the responsibility of each prospective bidder to submit an accurate email address when requesting Bidding/Contract Documents and to download each addendum. Addenda will be sent to the e-mail address on record. RETURN OF CONTRACT DOCUMENTS Upon returning sets promptly and in re usable condition to Plan & Print Systems, Inc. within 30 days after the date of the Bid opening, deposits will be refunded as follows: 1. Any Bidder will be refunded his or her deposit in full. 2. All other persons receiving any or all the Contract Documents, including Subcontractors and Material Suppliers, will be refunded their deposit in full. All Contract Documents received (except for Documents held by Successful Bidders) must be returned to Plan & Print Systems, Inc., at the above address. For Contract Documents which are not returned to the printer within this 30-day period, deposits will NOT be refunded. RIGHT TO WAIVE OR REJECT The Owner reserves the right to waive any informality in or to reject any or all Bids. BID SECURITY Each Bidder must deposit with its Bid, security in an amount and form subject to the conditions provided in the Contract Documents. WITHDRAWAL OF BIDS Withdrawal of Bids will be subject to the conditions provided in the Instructions to Bidders. COMPLETION TIME The work of this project shall be completed by the dates set forth on the Construction Schedule. REQUESTS FOR INFORMATION Requests for interpretation, information or clarification (RFI) of the Contract Documents must be made in writing to King + King Architects. Responses to RFIs will not be made over the telephone. Responses to RFIs will be advisory only and will not modify the Contract Documents. RFIs are to be e-mailed to: Ms. Welch's attention at swelch@kingarch.com and Mr. Brown's attention at dbrown@WatchDogBP.com Ms. Wingrove's attention at bwingrove@WatchDogBP.com

Sub-Bidding

Educational

$350,000.00

Public - City

Addition, Demolition, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Fabricator Qualifications, Temporary Facilities and Controls, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Spare Parts, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Cast Decks and Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Fire and Smoke Protection, Applied Fireproofing, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Aluminum-Framed Entrances and Storefronts, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Wall Coverings, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Bath Accessories, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Window Treatments, Casework, Countertops, Furnishings and Accessories, Rugs and Mats, Furniture
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Direct-Digital Control System for HVAC, Sequence of Operations for HVAC Controls, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Distributed Communications and Monitoring Systems, Distributed Systems, Clock Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Earthwork Methods, Soil Stabilization, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
89
Bidding Soon
1,061
All Active Projects
466
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2025

May 22, 2025

img_map_placeholder

20 Raymond Ave, Cortland, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Cortland CESD - 2024 Capital Project - Barry Addition - Plumbing

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.