BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2026 at 7:00 PM

Updated February 14, 2026

Remodeling of a detention facility in Plymouth, Minnesota. Completed plans call for the remodel of a 17,600-square-foot detention facility.

This project will remodel vacant areas in the Adult Corrections Facility (ACF) Industry Building to provide programming space for Child Visitation Area, Vocational Education Center for residents, and an ACF Staff Training Center. Purpose & Description: The Adult Corrections Facility's Industry Building, located at 1145 Shenandoah Lane in Plymouth, Minnesota, requires remodeling to accommodate specialized programming for staff, residents, and children of residents. The Children Visitation Area will be a planned safe space for residents who are mothers or fathers to visit with their child face to face in a setting conducive to this activity. The purpose of this Vocational Education Center is to provide that bridge to residents who are seeking new job skills. The Vocational Education Center will have a series of classrooms available to residents with training in the industrial trades. Simulation of skills will be provided to residents making it possible for them to earn initial training certificates. These certificates will allow the resident to continue with more hands-on intensive training in that trade. Conference rooms will be designed to facilitate the simulations and the technical overview by the instructor. The ACF Staff Training Center is a space provided to train staff in situational resident control using simulated environments such as a typical Men's individual living unit and a typical Women's living unit (often shared with one or more residents). The use of these simulated environments to train staff for possible high-risk situations aims to reduce the risk of staff and inmate harm or injuries. Additionally, a new office space for staff will be incorporated. The overall project size will be approximately 17,600 USF. This project is included in the County's 2025-2029 Capital Improvement Program (CIP). As of February 12, 2026, bidding is scheduled to occur in fourth quarter 2026. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of February 13, 2026, construction has begun.

Under Construction

Jails / Prisons

$10,200,000.00

Public - County

Remodeling

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
0
Bidding Soon
822
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2026

Project location map

1145 Shenandoah Ln N, Plymouth, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.