Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 7, 2025 at 8:00 PM

Updated April 12, 2025

Site work and paving for a road / highway in Downing, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Bids for the chip sealing of: 200th Street 1.3 miles 170th Street .42 miles 1165th Ave 1.12 miles 304th Street .17 miles o Hot oil o 3/8-inch fractured granite o 20 feet wide The Town of Tiffany reserves the right to reject any and all bids and to award in the best interest of the Town.

Post-Bid

Roads / Highways

$100,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
244
Active Projects
103
Bidding Soon
1,699
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

May 12, 2025

Project location map

Multiple Locations, Downing, WI

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed