Published June 3, 2025 at 8:00 PM

Updated June 4, 2025

Site work and paving for a mixed-use development in Clinton Twp, Michigan. Completed plans call for site work for a water / sewer project; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of June 3, 2025, the project was awarded to HMC, LLC, with an awarded amount of $473,322.50.** Reference Number 0000381437 Water main Replacement & Construction in an existing residential or commercially developed area. Sanitary Sewer Construction in an existing residential or commercially developed area. Contractor prequalifications for the 2025 calendar year will only be accepted for this bid. The qualifications for the general contractor and all subcontractors to be used on the project will be reviewed on the basis of the proposed bidder's past performance on work of a similar nature for Clinton Township and other owners. For this particular project, prequalification packages must be received by the Water & Sewer Division no later than 5 business days prior to the bid opening. Contact Anderson, Eckstein & Westrick to obtain submittal requirements for all prequalification categories. The approximate primary quantities involved in this work are as follows: - Remove and Replace 6"-12" Sanitary Sewer - 250 Ft - Reconnect Existing Laterals - 6 Ea - Remove and Replace 4" & 6" Sidewalk -1,015 Sft - Remove and Replace 4" & 6" Driveway -120 Sy - HMA Remove and Replace - 80 Ton - Raise/Reconstruct Manhole Structures - 2 Ea This primary work shall be included together with other incidental work including, but not limited to permit allowances, tree trimming, soil erosion control, project cleanup, traffic control and restoration. The project Bid Form will include all unit price bid items for this project. General Requirements - Bidder Prequalification/Preregistration Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Labor and Materials Bond 100 % A certified check, bank draft, or satisfactory bid bond, executed by the bidder and a surety company, payable to Clinton Township, in an amount at least equal to five percent (5%) of the bid amount, shall be submitted with each bid. The accepted bidder shall be required to furnish a satisfactory Performance Bond, and Labor and Material Bond in the amount of 100% of the Contract Price, and Maintenance and Guarantee Bond of 100% for two years of the Final Contract Price. The cost of the bonds and insurance will be paid by the accepted bidder as an incidental cost to the project. Question Deadline 04/17/2025 at 4:00 PM ET Questions are submitted online No .Please contact Mr. Scott J. Chabot, P.E. from Anderson, Eckstein & Westrick, Inc. at (586) 726-1234 for any specific questions regarding this advertisement to bid. This project shall be substantially completed by November 30, 2025. No Bid may be withdrawn for a period of sixty (60) calendar days after receipt of bids. The Charter Township of Clinton reserves the right to accept or reject any or all bids, to award the agreement to other than the low proposal, to negotiate the terms and conditions of all and any part of the bids, to waive irregularities and/or formalities, and in general to make award in the manner as determined to be in the Township's best interest and its sole discretion.

Award

Water / Sewer

$473,323.00

Public - City

Paving, Site Work

10

17

2

6

Subscribe For Documents

80 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
331
Active Projects
170
Bidding Soon
2,182
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2025

May 22, 2025

Project location map

Multiple Locations, Clinton Twp, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.