Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 12, 2025 at 7:00 PM
Updated November 13, 2025
Site work and paving for a mixed-use development in Minnetonka, Minnesota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Participate in the City of Minnetonka's Excelsior Boulevard (CSAH 3) reconstruction project from Spring Lane to Williston Road in the City of Minnetonka. Purpose & Description: The existing roadway (last reconstructed in the 1950s) is nearing the end of its useful life and warrants replacement. Routine maintenance activities (such as overlays and crackseals) are no longer cost effective in preserving assets. The current roadway environment consists of a 2- lane undivided configuration with turn lanes at key locations throughout the corridor. No dedicated accommodations for people walking or biking are currently provided along this segment of Excelsior Boulevard (CSAH 3). In 2023, the City of Minnetonka completed a feasibility study for the corridor that evaluated different pavement treatment options to improve conditions for people driving, multi-use trail facility design options for people walking and biking, as well as options for to preserve or replace existing water utilities. The City of Minnetonka has demonstrated a willingness to lead a reconstruction project along this segment of Excelsior Boulevard (CSAH 3), which is expected to include new pavement, curb, storm water utilities, a multi-use trail facility, ADA accommodations, traffic signals, and water utilities. Additionally, it is anticipated that proven traffic calming strategies (such as raised medians, curb extensions, and streetscaping) will be introduced to improve the crossing experience for people walking by managing the speeds of people driving. The budgeted revenues represents Hennepin County's anticipated costs in the city-led project. Construction Q2 2027 - Q4 2029 Completion 2030 The project is included in the County 2026-2030 Capital Improvement Program (CIP). As of November 13, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$12,100,000.00
Public - County
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2027
Excelsior Blvd, Minnetonka, MN
Related To This Project
Minnetonka, MN
Bid Date: Apr 18 2025
Minnetonka, MN
Bid Date: May 01 2025
Minnetonka, MN
Bid Date: May 05 2025
Minnetonka, MN
Bid Date: Jun 24 2025
Minnetonka, MN
Bid Date: Jun 26 2025
Minnetonka, MN
Bid Date: Jul 18 2025
Minnetonka, MN
--
Minnetonka, MN
Bid Date: Apr 03 2025
Minnetonka, MN
Bid Date: Mar 12 2025
Minnetonka, MN
Bid Date: Jan 16 2025
Minnetonka, MN
Bid Date: Apr 12 2019
Minnetonka, MN
--
Minnetonka, MN
Bid Date: Dec 02 2020
Minnetonka, MN
Bid Date: Dec 01 2020
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
