BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2025 at 7:00 PM

Updated November 13, 2025

Site work and paving for a mixed-use development in Minnetonka, Minnesota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Participate in the City of Minnetonka's Excelsior Boulevard (CSAH 3) reconstruction project from Spring Lane to Williston Road in the City of Minnetonka. Purpose & Description: The existing roadway (last reconstructed in the 1950s) is nearing the end of its useful life and warrants replacement. Routine maintenance activities (such as overlays and crackseals) are no longer cost effective in preserving assets. The current roadway environment consists of a 2- lane undivided configuration with turn lanes at key locations throughout the corridor. No dedicated accommodations for people walking or biking are currently provided along this segment of Excelsior Boulevard (CSAH 3). In 2023, the City of Minnetonka completed a feasibility study for the corridor that evaluated different pavement treatment options to improve conditions for people driving, multi-use trail facility design options for people walking and biking, as well as options for to preserve or replace existing water utilities. The City of Minnetonka has demonstrated a willingness to lead a reconstruction project along this segment of Excelsior Boulevard (CSAH 3), which is expected to include new pavement, curb, storm water utilities, a multi-use trail facility, ADA accommodations, traffic signals, and water utilities. Additionally, it is anticipated that proven traffic calming strategies (such as raised medians, curb extensions, and streetscaping) will be introduced to improve the crossing experience for people walking by managing the speeds of people driving. The budgeted revenues represents Hennepin County's anticipated costs in the city-led project. Construction Q2 2027 - Q4 2029 Completion 2030 The project is included in the County 2026-2030 Capital Improvement Program (CIP). As of November 13, 2025, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$12,100,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
0
Bidding Soon
811
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2027

Project location map

Excelsior Blvd, Minnetonka, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.