Published April 29, 2025 at 8:00 PM
Updated September 19, 2025
Site work and paving for a civil project in Seattle, Washington. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.
This Project, is located at 3 distinct sites within the City of Seattle: 1. The Broadview Site includes 2 locations m the Broadview' neighbourhood1) Along NW 130th St between 1st Ave NW and 3rd Ave NW and 2) Along NW 127th Street from 3rd Ave NW and then south along 1st Ave NW. 2. The Sylvan Site is located at the Sylvan Way SW and SW Orchard St intersection which is within the Longfellow Creek basin. 3. The NE 137th St Culvert Headwall Site is located on NE 137th Street between 30th Ave NE and 32nd Ave NE. Question Submission Deadline:April 10, 2025, 5:00pm QUESTIONS: Written questions must be submitted via email to Mark.Fredrickson@seattle.gov no later than 5:00 p.m. on the Thursday before the Bid Opening Date. Before Bid Opening: Mark Fredrickson, PE Public Works Contracts Section Seattle Public Utilities 700 5th Avenue, Suite 4900 P.O. Box 34018 Seattle, Washington 98124-4018 Phone (206) 684-7615 Email: Mark.Fredrickson@seattle.gov After Bid Opening and Before Execution: Purchasing and Contracting FAS_PW_Admin@seattle.gov Phone (206) 684-0444 After Execution: Construction Management Division Seattle Public Utilities 700 5th Avenue, Suite 4900 P.O. Box 34018 Seattle, Washington 98124-4018 Phone (206) 684-5068 Engineer's Estimate: $3,737,500 The purpose of the Work at the Broadview Site is to provide water quality treatment for street runoff by installing bioretention systems. This portion of the Project consists of the following elements of Work including but not limited to: construction storm water erosion control (submittal, implementation, and maintenance of the Construction Storm water Pollution Prevention plans (CSECP/SWPPP, TVSPP, SP, & TDP)); health and safety plan; clearing and grubbing; demolition and removal of existing surface pavement, sidewalks, and curbs; potholing; excavation; temporary traffic control plan and implementation, including flagging; site preparation and staging; survey; removal and abandoning of existing drainage structures and piping; temporary storm water bypass; protection, relocation, and/or adjustments of existing utilities, including water services; reconnection to the existing drainage system; installation of new drainage systems, including storm drainage piping, drainage structures, bioretention cells, and flow splitters; flow testing; install gate valves and assist SPU crews with water service and meter box relocations/adjustment; television inspections; side sewer reconnections; and final site restoration, including surface paving, pavement markings, permanent signing and posts, sidewalks, curbs, driveways, curb ramps, planting, and landscape establishment. The purpose of the Work at the Sylvan Site is to provide water quality treatment for street runoff that drains to Longfellow Creek by retrofitting the roadside with bioretention treatment system. This portion of the Project consists of the following elements of Work including but not limited to: construction storm water erosion control (submittal, implementation, and maintenance of the Construction Storm water Pollution Prevention plans (CSECP/SWPPP, TVSPP, SP, and TDP)); health and safety plan; clearing and grubbing; demolition and removal of existing surface pavement and curbs; potholing; excavation; temporary traffic control plan and implementation, including flagging; site preparation and staging; survey; removal and abandoning existing drainage structures and piping; well decommissioning; temporary shoring and dewatering; temporary storm water bypass; protection, relocation, and/or adjustments of existing utilities; reconnection to the existing drainage system; installation of new surface drainage systems, including: storm drainage piping, drainage structures, and bioretention cell; gutter flow testing: television inspections; and final site restoration, including: surface paving, curbs, soil amendments, planting, landscaping and establishment. The purpose of the Work at the NE 137th Headwall site is to improve debris collection as well as to reduce erosion and sedimentation that threatens the roadway embankment, neighbouring properties, and fish habitat. This portion of the Project consists of the following elements of Work including but not limited to: construction. storm water erosion control (submittal, implementation, and maintenance of the Construction Storm water Pollution Prevention plans (CSECP, TVSPP, SP, and TDP)); health and safety plan; clearing and grubbing; potholing; excavation; temporary traffic control plan and implementation including flagging; site preparation and staging; survey; temporary stream bypass: installation of a steel soldier pile headwall with concrete panels and a new trash rack at the upstream end. a 36-inch-diameter concrete culvert beneath the roadway; removal and re-installation of existing guardrail as necessary to do the work; new guardrail; and site restoration and planting. INCLUSION PLAN: For purposes of the Inclusion Plan, this is considered an UNDERGROUND type of project with a Past Performance of 20% WMBE utilization rates based on completed projects. For questions on the Inclusion Plan please contact Miguel Beltran at Miguel. belran@seattle.gov or 206-684 - 4525. Back-up contact is Carmen Kucinski at carmen.kucinki@seattle.gov or 206-684-0188. Bidders must understand the requirements of SMC 14.16 and RCW 49.46 and demonstrate compliance prior to Award. Written questions must be submitted via email to Murk.Fredricksoii@seattle.gov no later than 5:00 p.m. on the Thursday before the Bid Opening Date
Award
Roads / Highways
$3,561,500.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 16, 2025
June 16, 2025
Multiple Locations, Seattle, WA
Related To This Project
Seattle, WA
Bid Date: Apr 23 2025
Seattle, WA
--
Seattle, WA
--
Seattle, WA
Bid Date: Apr 17 2025
Seattle, WA
Bid Date: May 29 2025
Seattle, WA
Bid Date: Apr 28 2025
Seattle, WA
Bid Date: Apr 02 2025
Seattle, WA
Bid Date: Apr 08 2025
Seattle, WA
Bid Date: Apr 15 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.