BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 15, 2025 at 8:00 PM

Updated April 16, 2025

Renovation of a mixed-use development in Fairbanks, Alaska. Completed plans call for the renovation of a educational facility.

1. Re-coating maple wooden gym floors with oil-based gym finish at schools under the heading locations per attached specifications for recoating maple gym floors. The contractor will confirm the size of the areas to be refinished. A re-coat consists of screening the floor and applying one coat of oil-based gym finish to the manufacturer-recommended application. We assume lights and heat to be operational. Air handling systems should be able to be turned on and off during recoat all tape and tape adhesive residue should be removed by others. 2. Screening: The contractor shall perform a light sanding of the existing maple gym floor using a floor machine equipped with a screening screen. This process will remove minor surface imperfections and prepare the floor for the application of the new finish. The grit size of the screening screen shall be the manufacturer's recommendation. 3. Post-Job Cleanup and Waste Disposal: The contractor shall be responsible for cleaning the work area upon completion of the recoating process. This includes the removal and lawful disposal of all waste, debris, screening dust, and used materials. All affected surfaces must be left clean and ready for use by District personnel. The Buyer will not provide waste disposal containers or haul-off services. 4. Dust Containment Measures: The contractor shall utilize appropriate dust control procedures to minimize airborne particulates and contamination of adjacent areas. This includes, but is not limited to, the use of tack cloths, floor vacuums with HEPA filters, and dust barriers as needed. Dust shall not be allowed to enter HVAC systems, hallways, or adjacent classrooms. Locations West Valley High School 3800 Geist Rd Fairbanks, AK 99709 Hutchison High School 3750 Geist Rd Fairbanks, AK 99709 Lathrop High School 901 Airport Way Fairbanks, AK 99701 North Pole High School 601 NPHS Blvd. North Pole, AK 99705 Randy Smith Middle School 1401 Bainbridge Blvd. Fairbanks, AK 99701 Tanana Middle School 600 Trainor Gate Rd. Fairbanks, AK 99701 Ryan Middle School 1450 Cowles St. Fairbanks, AK 99701 All on-site work under this contract must be performed between June 3, 2025, and July 14, 2025. Questions regarding this IFB shall be directed to the Purchasing Agent.

Award

Educational

$35,084.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
1
Bidding Soon
44
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

June 3, 2025

Project location map

Multiple Locations, Fairbanks, AK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.