Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 9, 2025 at 8:00 PM
Updated June 10, 2025
Demolition, site work, paving and new construction of a mixed-use development in Tyler, Texas. Completed plans call for site work for a bridge / tunnel; transportation facility; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.
Remove and replace the passenger boarding bridge at Gate 4. THE PROPOSED WORK includes: o Demolition of passenger boarding bridge at Gate 4 o Installation of a new or refurbished fixed walkway at Gate 4 o Installation of a new passenger boarding bridge at Gate 4 o Installation of ground service equipment o Terminal apron pavement marking removal and replacement Contract documents including bid proposal forms, plans sheets, and specifications for the Project may be viewed and downloaded free of charge (with the option to purchase hard copies) atBIDDING SECURITY in the form of a Bid Bond or certified Cashier's Check in an amount not less than five percent (5%) of the total Bid shall be furnished by each Bidder as required by the above-mentioned documents. Such check, or collateral, shall be made payable to the City of Tyler. A DBE contract goal of 0.1% percent has been established for this contract. The Sponsor's award of this contract is conditioned upon the Bidder satisfying the good faith effort requirements of 49 CFR 26.53. Questions concerning this project shall be directed to James McKenzie, P.E., at jmckenzie@ksaeng.com or 214-668-1048. Question Deadline 04/15/2025 Please submit questions for this project at least 7 calendar days prior to bid opening through online. The City reserves the right to accept, reject, cancel or modify any bid or proposal, waive all formalities, and to award the bid most advantageous to the City. Estimate: $1,500,000 - $2,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Bridges / Tunnels
$1,809,157.00
Public - City
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 22, 2025
June 23, 2025
700 Skyway Blvd, Tyler, TX
Related To This Project
Tyler, TX
Bid Date: May 01 2025
Tyler, TX
Bid Date: Apr 22 2025
Tyler, TX
Bid Date: May 02 2025
Tyler, TX
--
Tyler, TX
Bid Date: Apr 22 2025
Tyler, TX
Bid Date: Apr 08 2025
Tyler, TX
Bid Date: May 01 2025
Tyler, TX
Bid Date: Apr 29 2025
Tyler, TX
Bid Date: Apr 15 2025
Tyler, TX
--
Tyler, TX
--
Tyler, TX
Bid Date: May 20 2025
Tyler, TX
--
Tyler, TX
Bid Date: Apr 01 2025
Tyler, TX
Bid Date: Mar 19 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
