BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 29, 2025 at 8:00 PM

Updated March 30, 2025

Site work and paving for a road / highway in Queen City, Missouri. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Schuyler & Adair Counties - Route 63 - Complete a full topographic survey and environmental review to allow for the development of conceptual design options, resulting in the selection of Preferred Alternatives. Roadway improvements along 33.6 centerline miles of Route 63 between the Iowa State Line and 2.1 miles north of Route KK, near Kirksville in Schuyler and Adair Counties. Length: 33.6 centerline miles DBE Goal (if applicable) 10% MODOT - RFQ Engineering - Roadway Improvements - Route 63

Conceptual

Roads / Highways

$25,000,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
42
Bidding Soon
415
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2026

Project location map

US-63, Queen City, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.