Published November 4, 2025 at 7:00 PM
Updated November 14, 2025
Site work for a development in Hunnewell, Missouri. Working plans call for site work for a development.
**As of May 19, 2025, no bids received. No definite date for the rebid.** Hunnewell Lake CA Residence Replacement Scope of Work for Concrete Materials Contract The scope of work consists of the following, but is not limited to: 1) Production and delivery of ready-mix concrete to the Project Site. The concrete material is expected to be provided in multiple phases. This includes providing concrete mix designs, material submittals, and other related as required in Specification Section 033000 "Cast In Place Concrete" for Owner Approval. a) Use of "Exposed to Freeze/Thaw Concrete" for foundation walls, exterior slabs-on-grade, sidewalks, and other concrete onsite. Normal-weight concrete. b) Minimum Compressive Strength: 5000 psi at 28 days c) Maximum W/C Ratio: 0.45. d) Slump Limit: 4 inches for concrete with verified slump of 2 to 4 inches plus or minus 1 inch, before adding high-range water-reducing admixture or plasticizing admixture, 8 inches maximum after admixture addition. e) Air Content: 5.5 percent, plus or minus 1.5 percent at point of delivery for 1-1/12-inch nominal maximum aggregate size. 2) Materials Contract Total Estimated Quantity: 164 Cubic Yards a) The concrete materials will need to be provided in 9 separate phases. See the unit prices for each phase along with estimated quantity per phase. b) All yardages and number of pours are estimates only for unit pricing. c) Additional fees such as mobilization, demobilization, travel, small load, and all other associated fees shall be included in the Concrete Materials unit pricing. d) Payment of invoice shall be rendered upon approved completion of each phase. 3) The Owner shall provide a minimum of 7 days lead time to the Contractor for scheduling required services. a) This work requires the use of pumper truck to place the Concrete material. Pumping services are not included in this contract. The Owner will provide the coordination between the pumper truck and concrete materials provider. No bids received
Final Planning
Conservation and Development
$300,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 16, 2025
November 19, 2025
6503 State Hwy Z, Hunnewell, MO
Related To This Project
Hunnewell, MO
Bid Date: Oct 16 2025
Hunnewell, MO
Bid Date: Dec 05 2025
Hunnewell, MO
Bid Date: Apr 07 2025
Hunnewell, MO
Bid Date: Mar 18 2025
Hunnewell, MO
Bid Date: Oct 20 2022
Poplar Bluff, MO
Bid Date: May 01 2025
Carthage, MO
Bid Date: Apr 29 2025
Jackson Township, MO
Bid Date: Apr 07 2025
Poplar Bluff, MO
Bid Date: Apr 23 2025
Maryville, MO
Bid Date: Apr 22 2025
Springfield, MO
Bid Date: May 06 2025
Manchester, MO
--
Arnold, MO
Bid Date: May 07 2025
Jefferson City, MO
Bid Date: Apr 11 2025
Saint Louis, MO
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.