Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 24, 2025 at 8:00 PM
Updated September 25, 2025
Site work and new construction of a civil project in Ocean Beach, New York. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
Project Title: Fimi 3d Well Relocation Construction Project Location: Ocean Beach, Ny 11770 1. 100% Unrestricted Full and Open Competition With Hubzone Price Evaluation Preference 2. Naics Code 237110, Size Standard $45,000,000.00 3. Project Magnitude Range: Between $5,000,000 and $10,000,000, 4. Submit Proposal No Later Than 2:00pm Est on 11 September 2025 to Michael Mccue, Michaell Mccue@usace.army.mil The Contractor Shall Begin Performance Within 10 Calendar Days and Complete It Within 230 Calendar Days After Receiving *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project no - PANNAD-25-P-0000 005125 DESCRIPTION OF SUPPLIES/SERVICES: The requirement is to provide a Sparling Instruments Model FM656 Tigermag EP Electromagnetic Flow Meter in this contract. This equipment is used to measure the flow of conductive liquids in full pipes. The Sparling Instruments Model FM656 Tigermag EP Electromagnetic Flow Meter is already in use at other Incorporated Village of Ocean Beach (the Village or VOB) facilities. The estimated cost of the requested brand-name requirement for the Sparling Instruments Model FM656 Tigermag EP Electromagnetic Flow Meter in this contract is estimated at $7,000. The estimated total cost for the construction portion of this project is $6,000,000. The cost of the requested brand-name requirement for the Sparling Instruments Model FM656 Tigermag EP Electromagnetic Flow Meter in Contract 3D (Ocean Beach Well Relocation is estimated at $7,000.00. The period of performance for the base contract is 260 calendar days.
Bid Results
Water / Sewer
$8,367,796.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 22, 2025
November 19, 2025
503 Bayberry Walk, Ocean Beach, NY
Related To This Project
Ocean Beach, NY
Bid Date: Jun 30 2025
Ocean Beach, NY
Bid Date: Sep 17 2024
Ocean Beach, NY
Bid Date: Jul 11 2024
Ocean Beach, NY
Bid Date: May 24 2023
Ocean Beach, NY
Bid Date: May 31 2023
Ocean Beach, NY
--
Ocean Beach, NY
Bid Date: Apr 11 2022
Ocean Beach, NY
Bid Date: Jul 09 2020
Elmira, NY
Bid Date: Apr 01 2025
Waterford, NY
Bid Date: Apr 30 2025
Schenectady, NY
--
New York Mills, NY
Bid Date: Apr 29 2025
New Rochelle, NY
Bid Date: Apr 17 2025
Kenmore, NY
Bid Date: Apr 01 2025
Irvington, NY
Bid Date: Apr 16 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
