BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 4, 2025 at 8:00 PM

Updated September 5, 2025

Site work and paving for a sidewalk / parking lot in Morganton, North Carolina. Design plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of September 9, 2025, this project is in the design phase. A timeline for construction has not yet been established. The boardwalk shall be free standing and not attached to existing buildings, ADA compliant and tie into existing greenway on each end of the project Request for Proposals (RFP) are Due by April 24, 2025, 2:00 PM Please direct all questions to Mark Hall. If you use email, please use the subject line of “RFQ and RFP for Boardwalk Replacement at River Village” so that your email is reviewed in a timely manner

Design

Sidewalks / Parking Lot

$200,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
250
Active Projects
152
Bidding Soon
1,750
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2026

Project location map

Multiple Locations, Morganton, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.