Site work for a stadium in Ventura, California. Completed plans call for site work for a stadium.

The Contract Time is 90 days. CONTRACTOR should consult the General Conditions, Supplementary Conditions, and General Requirements regarding Milestones and Liquidated Damages. If this Project includes work that will be performed by mechanical, electrical or plumbing ("MEP") subcontractors (contractors that hold C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43 or C-46 licenses), such MEP subcontractors must also be prequalified. A list of prequalified MEP subcontractors will be made available by the District to all bidders at least five business days prior to the bid opening date. It is the responsibility of the bidder to ensure that all MEP subcontractors holding any of the licenses listed above are properly prequalified before submitting a bid. This prequalification requirement applies even if the subcontractor will perform, or is designated to perform, work that does not require one of the licenses listed above, but the subcontractor holds one of the licenses listed above. Each bidder shall be a licensed contractor pursuant to the California Business and Professions Code, and be licensed to perform the work called for in the Contract Documents. The successful bidder must possess a valid and active Class A - General Contractor License at the time of bid and throughout the duration of this Contract. The Contractor's California State License number shall be clearly stated on the bidder's proposal The District reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding All bonds (Bid, Performance, and Payment) must be issued by a California admitted surety as defined in California Code of Civil Procedure section . Question Deadline 11/07/2025 Each request for clarification shall be submitted in writing, via email, to only the following persons: TO: Steve Key, LPA Architects, skey@lpadesignstudios.com 949-701-4052 CC: Ryan Hughes, VUSD Bond Program Manager, ryan.hughes@venturausd.org805-9019620 Anna Kohr, Balfour Beatty akohr@balfourbeattyus.com 805-393-8951 Pre-bid clarification request shall be filed a minimum of ten (10) days prior to bid opening. The Project consists of the construction of removal and reconstruction of track surfacing and synthetic turf field, associated sports elements, and miscellaneous hardscape and softscape associated with the stadium entry

Bid Results

Arenas / Stadiums

$1,131,900.00

Public - City

Site Work

31

22

19

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
320
Active Projects
163
Bidding Soon
2,365
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2025

January 19, 2026

Project location map

5670 Telegraph Pl, Ventura, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.