Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 30, 2025 at 8:00 PM
Updated July 31, 2025
Site work and paving for a mixed-use development in Ventura, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
The project consists of furnishing and installation of approximately 8,500 linear feet of 24-inch cement mortar lined and coated steel pipe, including all appurtenances such as gate valves, air and vacuum valves, and blowoffs, excavation, bedding, and backfill of the pipe, traffic control, pavement removal and replacement, and connections to existing pipelines and the Corbett Reservoir. Additional work includes the furnishing and installation of pressure reducing valves, altitude valves, modification of the existing piping including installation of new piping and removal of existing piping, excavation, bedding and backfill of existing piping, pavement removal and replacement, modification of existing electrical and instrumentation work and controls, piping, concrete pad and site grading at the Bailey flow control valve (FCV) station and appurtenant work as shown on the plans with Drawing No. 2017-D-030. Contact the Project Manager, Will Trax at (805) 654-7842 or via email at wtrax@cityofventura.ca.gov with technical questions. Completion Time: 450 Consecutive Calendar Days
Bid Results
Water / Sewer
$11,097,540.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2025
June 30, 2025
Multiple Locations, Ventura, CA
Related To This Project
Ventura, CA
Bid Date: Jul 29 2025
Ventura, CA
Bid Date: Apr 24 2025
Ventura, CA
Bid Date: Feb 04 2026
Ventura, CA
Bid Date: Apr 09 2025
Ventura, CA
Bid Date: Apr 29 2025
Ventura, CA
Bid Date: Nov 21 2025
Ventura, CA
Bid Date: May 20 2025
Ventura, CA
Bid Date: Apr 01 2025
Ventura, CA
Bid Date: Apr 17 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
