BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 24, 2025 at 8:00 PM

Updated July 22, 2025

Site work and paving for a mixed-use development in Tallahassee, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Counties: Leon Road Name: SR 263 (Capital Circle Nw) Limits: From S of Sr 10 (Us 90/tennessee St) to N of Sr 8 (I-10) Project(s): 21972255201(*) Federal Aid No: D324011B Project(s): 21972255202 Federal Aid No: D324011B Project(s): 21972255203 Federal Aid No: N/A Project(s): 21972255204 Federal Aid No: N/A Total Roadway Length: 2.27 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 2.27 Miles Financial Project Id 219722-5-52-01, 219722-5-52-02, 219722-5-52-03 and 219722-5-52-04 Contract Days: 340 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Days Please read the full advertisement Description: The Improvements under this Contract FPID: 219722-5-52-01 consist of Milling and resurfacing of SR 263 (Capital Circle NW) from south of SR 10 (US90) (Tennessee Street) to north of SR 8 (I-10) in Leon County. Construction activities include milling and resurfacing existing travel lanes, auxiliary lanes, bike lanes, median crossovers, turn lanes, bus stops, and paved shoulders. Safety improvements include adding northbound right-turn lane at Gearhart Road with striping upgrades; Upgrading right-turn lane traffic signals in both directions at U.S. 90; Adding seven-foot buffered bike lane on both sides of the road; Upgrading pedestrian features to meet current Americans with Disabilities Act (ADA) standards and providing Minor drainage improvements. This project is to be let to Contract with FPID: 219722-5-52-02. This project includes safety improvements for extending the northbound left-turn lane at Tharpe Street; Adding the northbound right-turn lane at Brittany Boulevard and Improving Star Metro Azelea route by moving the bus stop located south of Brittany Boulevard to north of Brittany Boulevard; This project is also to be let to Contract with FPID: 219722 -5-52-03. This project includes Utility adjustments including manhole and valve adjustments.; This project is also to be let to Contract with FPID: 219722-5-52-04. This project includes the adjustment of a utility gas valve. Question Deadline 04/23/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 010 - Resurfacing - SR 263 (Capital Circle Nw) The Improvements under this Contract FPID: 219722-5-52-01 consist of Milling and resurfacing of SR 263 (Capital Circle NW) from south of SR 10 (US90) (Tennessee Street) to north of SR 8 (I-10) in Leon County. Construction activities include milling and resurfacing existing travel lanes, auxiliary lanes, bike lanes, median crossovers, turn lanes, bus stops, and paved shoulders. Safety improvements include adding northbound right-turn lane at Gearhart Road with striping upgrades; Upgrading right-turn lane traffic signals in both directions at U.S. 90; Adding seven-foot buffered bike lane on both sides of the road; Upgrading pedestrian features to meet current Americans with Disabilities Act (ADA) standards and providing Minor drainage improvements. This project is to be let to Contract with FPID: 219722-5-52-02. This project includes safety improvements for extending the northbound left-turn lane at Tharpe Street; Adding the northbound right-turn lane at Brittany Boulevard and Improving Star Metro Azelea route by moving the bus stop located south of Brittany Boulevard to north of Brittany Boulevard; This project is also to be let to Contract with FPID: 219722-5-52-03. This project includes Utility adjustments including manhole and valve adjustments.; This project is also to be let to Contract with FPID: 219722-5-52-04. This project includes the adjustment of a utility gas valve QA - 04/28/2025 CONTRACT NO.: CAL88

Award

Roads / Highways

$4,037,653.00

Public - State/Provincial

Paving, Site Work

82

7

7

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
27
Bidding Soon
554
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2025

May 12, 2025

Project location map

FL-263, Tallahassee, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.