Published April 22, 2025 at 8:00 PM
Updated April 23, 2025
Site work and paving for a mixed-use development in Erda, Utah. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Tooele County Bates Canyon Road Street Improvements Project Question Deadline 04/14/2025 at 11:30 PM MT Deadline to submit Questions electronically. The contract award for this solicitation will not be posted online. PROJECT DESCRIPTION: The west end of the Project is located at property line of the new Jr. High School and goes east on the south side of the road and connects into Cambridge Way. These improvements are approximately 1260 Lineal Feet. On the north side of Bates Canyon Road from the high School to the existing road improvements is approximately 470 Lineal. Also included is the paint striping, pavement markings and re-grading the shoulders. Drainage swales will also be graded on both sides to provide positive drainage. Utility relocation and adjustment of utility boxes rims to new finish grade, fence removal and new fence construction, sign relocation if required and new sign placement are also included. The following is a brief summary of some of the related tasks: 1) Scheduling of work shall be approved by the County prior to beginning work on any portions of the project. 2) The contractor shall submit a "Traffic Control Plan" for approval prior to beginning work. The traffic control plan shall be in conformance with the Manual on Uniform Traffic Control Devices (MUTCD). The contractor shall furnish, place, and maintain all traffic control signs and devices. Payment for all traffic control measures shall be included in the contract price for the item of "Traffic Control". At no time will more than one lane be closed to traffic. The contractor shall pave one lane at a time and then keep that lane closed until Contractor determines the conditions of the new asphalt concrete is acceptable for opening. 3) All property owners affected by the construction shall be notified one day in advance of the beginning of construction. Suitable tow away signs will be properly posted 24 hours prior to the surfacing. Should the work not occur on the specified day, new notifications shall be distributed. 4) The roadway will be excavated to sub-grade with excess material being properly disposed of, sub-grade will be graded and shaped to proper crown and profile and then compacted, soft sub-grade areas will be stabilized, additional Granular Backfill Borrow material will be provided and combined with the pulverized asphalt and untreated base course material to be placed, shaped and compacted to line and grade as select borrow for the new roadway embankment for both Pole Canyon Road and Center Street. Bates Canyon Road Granular Borrow to be 7-Inches thick. The untreated base course section will be 8-Inches thick on Bates Canyon Road that material will be graded to new design profile and compacted, and the surface asphalt will 3-inches for Bates Canyon Road of BSC asphalt material PG 64-28 will then be placed and compacted as the finished surface. Any disturbed or damaged or relocated Accesses will need to be repaired and restored. Also included is new signage and paint striping. On the south side of the road from Cambridge Way to the new Jr. High School curb and gutter with 36" RCP pipe will be installed for approximately 1700 Linear Feet. Provide proper drainage away from the new asphalt as dictated by the existing shoulder conditions and then parallel with the roadway in order to properly drain. Some drainage piping is required in an east/west and north/south direction under Bates Canyon Road with both 15 and 36-Inch Piping, with 1 flared end sections (15 -Inch) and multiple Storm Drain Catch and Cleanout Box. 5) Any areas of soft sub-grade which are unable to adequately support the future conditions as determined by the Owner will be removed by the Contractor and replaced per Bid Item #7 prior to the placement of the untreated base course and asphalt. 6) Imported untreated base course material will be properly placed, graded and compacted along the shoulders of the road. The material will be graded at a 2% slope away from the new edge of asphalt for the 3-foot shoulder, then slope away at a 3 to 1 slope for at least 3-feet or as needed to match existing grade. 7) The drainage along the roadways shall be graded to provide positive drainage to the west and for the most part to the south towards the new Jr. High. 8) Any existing property access shall be adequately restored to the property owner's satisfaction. 9) Stripe and Pavement Markings are to provided and properly installed per Design Sheet C-203 and per Manufacturers Recommendations. 10) Signage will be installed per the MUTCD. 11) This project must be completed 120 Calendar Days following the Notice to Proceed.
Final Planning
Roads / Highways
$750,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 18, 2025
October 22, 2025
Bates Canyon Rd, Erda, UT
Related To This Project
Erda, UT
--
Erda, UT
Bid Date: Oct 29 2025
Erda, UT
Bid Date: Mar 18 2025
Erda, UT
--
Erda, UT
Bid Date: Aug 08 2024
Erda, UT
Bid Date: Mar 07 2022
Erda, UT
Bid Date: Jun 09 2023
Erda, UT
Bid Date: Mar 02 2023
Erda, UT
Bid Date: Jun 15 2022
Erda, UT
Bid Date: Mar 02 2023
Erda, UT
Bid Date: Jul 20 2022
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.