BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 20, 2025 at 8:00 PM

Updated May 21, 2025

Site work and paving for a road / highway in Concord, North Carolina. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Contractor shall provide all work for the removal and replacement of certain sections of the sidewalk system as marked in the field on portions of Cedar Drive and Pine Street in the City of Concord, North Carolina and including, but is not limited to, all mobilizations, demobilizations, materials, signs, barricades, tools, labor, rentals, consumables, miscellaneous hardware, any supporting hardware and software, excavations and grading, hauling, incidental relocations, forming, compaction, backfilling, sawing exiting concrete, furnishing and placing concrete, construction joints, security of the work, traffic control and safety operations, removal of any debris, cleanup, and disposal(s), special subcontracting, permits and licenses, seeding and mulching and all else required as necessary to the satisfaction of the Director and the City of Concord at the charges set forth either in this paragraph or in Exhibit The City shall withhold no retainage on Contracts having a "total project cost" of less than $100,000.00. The City may withhold retainage on contracts having a total project cost between $100,000 and $299,999. The City shall withhold retainage on contracts whose total project cost exceeds $300,000. When withheld, retainage shall equal no more than five percent of each progress payment. When the project is fifty per cent complete, the City shall not retain anything from future project payments provided that (i) the surety concurs in writing, (ii) the Contractor continues to perform satisfactorily, (iii) any non-conforming work identified in writing by the architect, engineer(s) or City has been corrected by the Contractor and accepted by the architect, engineer(s) or City. However, if the City determines that the Contractor's performance is unsatisfactory, the City may withhold up to five percent retainage from each project payment. The City may withhold additional amounts above five percent for unsatisfactory job progress, defective construction not remedied, disputed work, third party claims filed against the owner or reasonable evidence that a third-party claim will be filed Thank you for your consideration and if you have any questions with this quote request, please call us at 704-920-5341 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$43,537.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
208
Active Projects
123
Bidding Soon
1,564
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2025

May 9, 2025

Project location map

To Be Determined, Concord, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.