Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 29, 2025 at 8:00 PM
Updated April 30, 2025
Renovation of an educational facility in Winnipeg, Manitoba. Completed plans call for the renovation of a educational facility.
Work under this contract includes the 300 and 400 levels of University College, including stairwells. Questions and clarifications are required to be emailed by April 4th, 2025, end of day to both the Technical and Administrative Contact Person. Scope: the removal of the existing flooring and baseboards, floor preparations as required, and replacement of flooring and baseboards in the following locations Level 300 classroom side corridors and stairwells, Level 400 corridors and stairwells, Classrooms 375, 376, 377, 379, 382, 383, 384, 385, 386, and 396. The flooring surfaces must allow for safe passage at the end of each shift for the following day as areas will be in use. Classrooms must be completed with furniture back in place within approximately 1 week of taking the room offline. New flooring to be Johnsonite iQ Optima in 246 Light Sand Beige CB (VL1 Harvest Time CB) and new baseboards to match existing colour and size. Coordination schedules will be required to be reviewed and approved to ensure minimal disruption to users at least 10 working days before mobilization. Furniture in the noted areas will be moved by General Services based on approved work schedule. Work will need to take place after 4:30pm and before 7:00am. Shutdown coordination will be required for all hot works with advance notice and approval required. Work must be completed between May 5th and August 15th, 2025. Documents are available at https://umanitoba.bonfirehub.ca/ * Only those companies, who are on the list of Pre-Qualified General Contractors and/or Flooring Installers of University of Manitoba, are eligible to bid this project.
Award
Educational
$165,100.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 11, 2025
May 5, 2025
210 Dysart Rd, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: Apr 11 2025
Winnipeg, MB
Bid Date: Apr 22 2025
Winnipeg, MB
Bid Date: Apr 22 2025
Winnipeg, MB
Bid Date: Apr 14 2025
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Apr 22 2025
Winnipeg, MB
Bid Date: Apr 22 2025
Winnipeg, MB
Bid Date: May 01 2025
Winnipeg, MB
Bid Date: Apr 15 2025
Winnipeg, MB
Bid Date: Apr 11 2025
Winnipeg, MB
Bid Date: Apr 11 2025
Winnipeg, MB
Bid Date: Mar 31 2025
Winnipeg, MB
Bid Date: Apr 29 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
