BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 29, 2025 at 8:00 PM

Updated April 30, 2025

Renovation of an educational facility in Winnipeg, Manitoba. Completed plans call for the renovation of a educational facility.

Work under this contract includes the 300 and 400 levels of University College, including stairwells. Questions and clarifications are required to be emailed by April 4th, 2025, end of day to both the Technical and Administrative Contact Person. Scope: the removal of the existing flooring and baseboards, floor preparations as required, and replacement of flooring and baseboards in the following locations Level 300 classroom side corridors and stairwells, Level 400 corridors and stairwells, Classrooms 375, 376, 377, 379, 382, 383, 384, 385, 386, and 396. The flooring surfaces must allow for safe passage at the end of each shift for the following day as areas will be in use. Classrooms must be completed with furniture back in place within approximately 1 week of taking the room offline. New flooring to be Johnsonite iQ Optima in 246 Light Sand Beige CB (VL1 Harvest Time CB) and new baseboards to match existing colour and size. Coordination schedules will be required to be reviewed and approved to ensure minimal disruption to users at least 10 working days before mobilization. Furniture in the noted areas will be moved by General Services based on approved work schedule. Work will need to take place after 4:30pm and before 7:00am. Shutdown coordination will be required for all hot works with advance notice and approval required. Work must be completed between May 5th and August 15th, 2025. Documents are available at https://umanitoba.bonfirehub.ca/ * Only those companies, who are on the list of Pre-Qualified General Contractors and/or Flooring Installers of University of Manitoba, are eligible to bid this project.

Award

Educational

$165,100.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
46
Bidding Soon
534
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2025

May 5, 2025

Project location map

210 Dysart Rd, Winnipeg, MB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.