BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2025 at 8:00 PM

Updated May 3, 2025

Site work for a civil project in Hopkinton, Rhode Island. Completed plans call for site work for a road / highway; and water / sewer project.

2608G 2024 DMS Replacement Project The work included in this contract shall include removal and salvaging of existing DMS located on separate supports structures at the following locations: I-95 NB and SB at the Connecticut State Line in Hopkinton, I95 SB at mile marker 15.4 in West Greenwich, Rt 146 SB and NB in North Providence, and Route 114 NB in East Providence. The proposed DMS units shall have hard-wired connections for both power and communications. The work includes removal and disposal of the existing steel DMS support structures; utility coordination; design and installation of structural supports and foundations for each DMS; installation of DMS on support structures; installation of a groundmounted control cabinet; testing of DMS and associated equipment; installation of handholes and conduit; removal and installation of guardrail; utility connections; placement of soil and seed; and traffic control. Vendor Q&A Start Date: March 28, 2025 at 11:15:00 AM EDT Vendor Q&A End Date: April 13, 2025 at 12:00:00 PM EDT If you have any questions, please contact: M. Scott Stephens 1 Capitol Hill 2nd Floor Providence RI, 02908 United States Tel: 401-574-8152 Fax: michael.stephens@purchasing.ri.gov The Contractor will be required to meet the established goal of not less than DBE 0% percent of the contract bid price to the Contractors, Subcontractors, and/or suppliers which qualify as Disadvantaged Business Enterprises A bid bond payable to the State of Rhode Island, in the amount of 5% of the total or gross sum of the bid must be furnished by each bidder. A performance bond of one hundred (100) percent of the contract price with a satisfactory surety company will be required of the successful bidder. All surety companies must be listed with The Department of the Treasury, Fiscal Services, Circular 570, (Latest Revision published by the Federal Register), The Department of Transportation reserves the right to reject any or all bids. RIDOT: 2024 DMS Replacement Project

Bid Results

Roads / Highways

$2,985,855.00

Public - State/Provincial

Site Work

128

10

9

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
575
Active Projects
220
Bidding Soon
4,087
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2025

May 29, 2025

Project location map

Multiple Locations, Hopkinton, RI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.