BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 15, 2025 at 8:00 PM

Updated April 16, 2025

Demolition, site work and asbestos abatement for a mixed-use development in Gilroy, California. Completed plans call for the demolition of a educational facility; for site work for a educational facility; and for asbestos abatement for a educational facility.

Demolition and Site Work - Transportation Yard Restroom Building Demolition and Site Work for Installation of new Restroom Building at Transportation Yard 2025 The Project consists of: This project includes the abatement and partial demolition of an existing building, along with all necessary site work and foundation installation to accommodate a new relocatable restroom facility. Comprehensive requirements and specifications are provided in the project documentation To bid on this Project, the Bidder is required to possess one or more of the following State of California contractors' license(s): A, B, Pursuant to Public Contract Code section 20111.5, only prequalified bidders will be eligible to submit a bid for this Project. Any bid submitted by a bidder who is not prequalified shall be non-responsive and returned by email unopened to the bidder. A bid bond by an admitted surety insurer on the form provided by the District a cashier's check or a certified check, drawn to the order of the Gilroy Unified School District, in the amount of ten percent (10%) of the total bid price, shall accompany the Bid Form and Proposal, as a guarantee that the Bidder will, within seven (7) calendar days after the date of the Notice of Award, enter into a contract with the District for the performance of the services as stipulated in the bid. The successful Bidder shall be required to furnish a 100% Performance Bond and a 100% Payment Bond if it is awarded the Contract for the Work. The Board reserves the right to reject any and all bids and/or waive any irregularity in any bid received. If the District awards the Contract, the security of unsuccessful bidder(s) shall be returned within sixty (60) days from the time the award is made. Unless otherwise required by law, no bidder may withdraw its bid for ninety (90) days after the date of the bid opening.

Bid Results

Educational

$900,000.00

Public - City

Asbestos Abatement, Demolition, Site Work

99

27

2

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
337
Active Projects
179
Bidding Soon
2,477
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

May 8, 2025

Project location map

220 Swanston Lane, Gilroy, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.